Ops: Restaurant Handover Checklist

  • Fire Safety in place - extinguishers with tags, signage, alarm working, fire blankets up, assembly point located, covers removed from detectors

  • Fire inspection date set up and booked in

  • FS & HS folders on site

  • First aid, burn and spill kit on site

  • Sharps box on site

  • Store keys given to manager

  • Key issued to Yates driver

  • Security alarm set up and working

  • Ecolab products installed & trained

  • All alarm code doors set to 1972

  • All supplier accounts set up & access given to store manager to place orders

  • All office supplies ordered/on site

  • All delivery schedules and orders communicated to store manger

  • Loomis safe set up and change ordered for F&F and opening

  • Location of water cut off and gas cut off points

  • Compliance printed, famed and put up BOH – FS cert, HS certificate, insurance, HS poster, First aid/fire poster

  • All essential stock on site ready for training

IT : Handover Checklist

  • All digital screens working

  • Phone line set up. Store phone number is:

  • Internet working

  • Music system working and sound is correct- not tinny or fuzzy

  • POS working – kiosks, tills, menu board

  • Kiosks in training mode

  • All printers working

  • Workforce Machine set up

  • Staff list on tills

  • Bump bars in place

  • All payment devices set up and tested

  • CCTV working and tested

Training

  • All wall charts on site – Batter fry, fryers, sides, sandwich, COSHH chart

  • How to guides printed – Handwash, last hour drop chart, set up batter fry, defrost, make batter, COSHH

  • Team training books on site

  • Uniform and shoe covers on site

  • SOP files on site

  • OP’s comms board on site

  • Training plan in place

  • 2 week training rota and opening rota sent to team and on workforce

  • All team on Popeyes Academy

Equipment Checklist

  • Sides PHU 1xlarge 1xsmall temp – 110 T, 129 B

  • Fillets PHU – fillets – 45mins

  • Boxing PHU – 1xvegan(30min)/3xspicy tenders, 4xmild tenders (40min), 4x wings (30min)

  • Birdcage – please leave on to test for a few hours. Ensure its labelled mild/spicy and 1-4 sections for timer

  • Toasters x 2

  • Hot holding drawers

  • Oven – set up with all menu items

  • Hot water boiler

  • Sato machine – with latest update installed

  • Walk-in freezer clean and working to correct temp

  • Walk-in fridge clean and to correct temp

  • Walk-in fridge set up – chicken trolleys labelled by product, 2xracking, 1xprep trolley, fridge plan in place and on wall

  • Stand alone chilled working to temp

  • Batter fry x 2 all parts and working – flour bins, scoops, gastros, cold master tubs etc

  • Chicken fryers all labelled correctly, commissioned, has gas, can filter and working to temp – times tested

  • Fries Fryers – commissioned, set up with times 3mins single batch 3.15 double batch, can filter and working to temp. JIB turned off and cook count set to 99

  • Fry dispenser on site and correct temp

  • Fry dump working and to temp

  • Undercounter and delivery fridges working and to temp

  • Washing machine installed and working

  • Dishwasher and grease trap commissioned and working – all chemicals installed and salt in unit ready for use

  • Carpigiani machine commissioned and working – syrups set up correctly C 140 S 140 C 65 LTO 55 (STC)

  • Lockers on site

  • Chemical cupboard set up

  • Safe on site

  • Coke machine set up and tested – check taste and quality – check drainage

  • Ice machine set up and working

  • FOH ice/water machine working and draining correctly

  • 3 compartment sink set up, sanitiser sink labelled, test strips and all chemicals available

  • BOH storage set up and organised no food on floor

  • High chairs on site and safety stickers on

  • Toilets – Hand dryer working, soap dispenser installed, toilet roll holder, toilet brush, bin, sanitary bin and air fresher

  • Easy access toilet – hand rail and alarm installed and working, baby change facilities installed and signage

  • Staff hand wash – hand dryer working, soap dispenser install, hand sanitiser installed, signage available, nail brush in sanitiser tub for batter fry

  • Brush mop holders put up on wall

  • Bins on site and in correct area with guide lines explained for collection

  • All small wares and deliveries checked off and shortages reported to Chloe/Sam

  • Restaurant bin areas labelled and bins and drainage in place, brush holders on sides

  • All furniture in place

  • Table numbers and table plan in place

  • Halal certificate printed, framed and on show

Calibration Checks (cook off)

  • Temp BIC

  • Temp Tenders

  • Temp Fillets

  • Temp Wings

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.