Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Untitled Page
-
Are required Permits Approved and in place prior to works commencing
-
Jacking Crew completed prestart prior to works commencing
-
Correct PPE Worn by all members of the team
-
Is the work area free from obstructions to enable team to affect the safe load and unload of the modular units
-
Portable Hand Tooling etc in good working order, free from damage and tagged (If Required)
-
Jacks / Pads / etc secured to prevent load shift during transport
-
Correct Manaual Handling techniques Used when lifting and carrying jacks and equipment
-
Sole Pads and Jacks placed in correct position to enable modulars to be lifted/lowered into correct position
-
Is the supervisor verifying the position of all equipment prior to works commencing
-
Are personnel remaining clear of the jacks when in operation
-
Are packers placed into position under the direction of the supervisor
-
Is the Transport Driver aware of the hazards associated with their role?
-
Is reversing under modular controlled and spotters in place to direct driver
-
Are UHF Communications between spotter / Supervisor and Driver being utilised
-
When removing Jacks and Equipment from beneath modular units, are modulars in a safe position and secure
Inspection Team
-
undefined
-
undefined
-
undefined
-
undefined
Corrective Actions
-
undefined
-
undefined
-
undefined
-
undefined