Information
-
Site conducted
-
Document No.
-
Audit Title
-
Site and Description of Work
-
Conducted on
-
Person Carrying Out Inspection
-
Location
-
Manager Responsible for Project
-
Supervisor Responsible for Project
- Andy Nicholson
- Tom Kryszak
- Vince Emmery
- Trevor Budge
- Stuart Pike
- Ian Quarmby
Modular 4 Site set up
-
Were any work areas seen set up as per Plan of Work
-
Was the Plan of Work acceptable? If No has amendments been made and recorded by the supervisor.
-
Was the site setup satisfactory? If No what improvements could be made
Modular 5 controlled removal techniques
-
Is removal being undertaken as per Plan of Work
Modular 6 RPE
-
Was the correct RPE being worn for tasks being undertaken
-
Was RPE being used or stored correctly
Modular 7 PPE
-
Was the correct PPE being worn for tasks being undertaken
Modular 8 Decontamination
-
Was the DCU set up and fully operational
-
Was the unit clean / tidy
-
Was the transit route clean and signage present
-
Is the DCU sufficient for the number of people on site including the analyst?
Modular 9 Cleaning / Air testing
-
Is air testing been undertaken as per plan of work
Modular 10 Plant
-
Was all plant being used in good working order
-
Was all plant not being used stored correctly / safely
Modular 11 waste
-
Was waste being dealt with as per plan of work
-
Is the storage location for waste adequate in good condition and secure
-
Is the work area/ enclosure free from waste (not allowed to accumulate).
Modular 12 Emergencies
-
Has emergency procedures and hospital location been specified within plan of work
Modular 13 Non Asbestos Risks
-
Have Risk and COSHH assessments been undertaken and are they sufficient for site.
Modular 14 Fault Finding
-
Is the enclosure or enclosures/Airlocks/ Bag-Locks sufficient and fit for purpose
-
Has the supervisor carried out all his inspections and are they adequate
Modular 15 Roles and Responsibilities
-
Is the supervisor ensuring all operatives are adhering to the plan of work and there training
Modular 16 Record keeping
-
Is the number of employees the same within Plan of Work as on ASB5.
-
Had all RPE checks been undertaken / recorded
-
Are all personal files on site for the number of employees
-
Had all Plant checks been undertaken / recorded
-
Had all Enclosure checks been undertaken / recorded
-
Had the daily dairy been filled into a reasonable standard
Modular 17 Management systems and monitoring
-
Is record keeping in progress and site diary up to date.
Modular 18 RAs and Plan of Work
-
Has the Plan of Work and Risk Assessments been explained and understood by all involved with the works
Modular 19 Information, Instruction and training
-
Is the supervisor carrying out TNAs and monitoring his operatives
Comments
-
Comments of site etc if applicable
-
Supervisor responsible for site
-
Manager Carrying Out Inspection