Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1.0 Documentation
-
1.1 SHEQ documented and on site?
-
1.2 Site Inductions - Completed and signed, induction card in use?
-
1.3 Site induction register up to date?
-
1.4 Services Disconnection - required, disconnection form signed off by appropriate trades?
-
1.5 Is the subcontractor register up to date?
-
1.6 Are there regular Tool Box Talks?
-
1.7 Date of last incident/injury report?
-
1.8 Are subcontractors supplying Safety Data Sheets?
-
1.9 Are SDS entered into register, register available to workers?
-
1.10 Is there plant on site and entered into register?
-
1.11 Are hot works permits - required, completed and checked by site supervisor?
-
1.12 Are confined space pace permits - required, completed and checked by the site supervisor?
-
1.13 Are emergency drills conducted, date of last drill?
-
1.14 Is the electrical equipment register up to date?
-
1.15 Subcontractors - Attachment 8 completed, insurances up to date, SWMS where required.
2.0 General Housekeeping
-
2.1 Entry and walkways kept clear?
-
2.2 Floor surfaces uncluttered?
-
2.3 Is the general public isolated from the work face?
-
2.4 Stairwells kept clear?
-
2.5 Exit doors clear and unobstructed?
-
2.6 Is the sufficient natural lighting?
-
2.7 Is there adequate building / temporary lighting.
-
2.8 Are emergency exit lights / signs in place?
3.0 Site Safety
-
3.1 Sign-In register in place?
-
3.2 Safety, warning and PPE signage displayed?
-
3.3 PPE compliance?
-
3.4 Barriers,fences,hoardings or handrails secure?
-
3.5 Floor penetrations covered or barricaded with signage displayed?
-
3.6 Manual handling aids being used?
-
3.7 Materials stacked safely?
-
3.8 Plant prestart checklists completed?
-
3.9MDF cutting room in place, if required?
4.0 First Aid and Emergencies
-
4.1 Evacuation plan displayed?
-
4.2 Emergency contact numbers, first aid signage and SOP 01 & 02 displayed?
-
4.3 Register of First Aiders displayed next to First Aid Cabinet?
-
4.4 First Aid cabinet stocked, clean and orderly?
-
4.5 First Aid cabinet accessible to workers?
-
4.6 Fire extinguishers available?
-
4.7 Base building fire hose reels?
-
4.8 Signage displayed for fire hose reels or extinguishers?
-
4.9 Portable emergency siren available?
-
4.10 Nurse call operational, if required?
5.0 Site Amenities
-
5.1 Fridge, microwave, kettle / boiling water, fresh drinking water supplied?
-
5.2 Adequate tables and chairs?
-
5.3 Toilets regularly cleaned and stocked?
-
5.4 Areas kept clean, sufficient rubbish bins?
6.0 Electrical Safety
-
6.1 Electrical equipment tested and tagged - 3 monthly cycle?
-
6.2 Leads elevated with lead stands or hooks?
-
6.3 Temporary site power boards comply with AS 3012?
-
6.4 ICMG 05 - Electrical site safety displayed on cover of site boards?
7.0 Working at Heights
-
7.1 Scaffold complete with edge protection, access ladder / stairs, kick boards.<br>Handover certificate filed in Folder 2?
-
7.2 Scaffold inspected monthly and certificate filed in Folder 2?
-
7.3 Portable ladders rated 120 kg or above?
-
7.4 Extension ladders placed at 4:1 ratio and secured top and bottom?
-
7.5 Extension ladder protrudes al least 1 metre above working platform for access purposes?
-
7.6 Minimum height of step ladders 1800mm?
8.0 Rubbish Removal
-
8.1 Adequate wheelie bins located at suitable points on site or floor plate?
-
8.2 Provision for designated rubbish areas if required. Barricaded with signage?
-
8.3 Rubbish removed from site regularly?
9.0 Environmental
-
9.1 Noise levels
-
9.2 Dust levels / air quality
-
9.3 Pedestrian / traffic management
-
9.4 Stormwater protection. Hay bales / silt sock
-
9.5 Silt fences, sediment traps, pits
-
9.6 Tree protection
10.0 Close out
-
Details of corrective / preventative actions to be forwarded to SHEQ Manager by: