Information
-
Client / Site
-
Job Number
-
Task
-
Audit Conducted on
-
Prepared by
Engineers Auditing
-
Engineer names
Engineer
-
Engineers Working On Site
- N Turner
- S Walker
- A Beal
- D Tindal
- M Turner
- D Boot
- K Shepherd
- P Marshall
- K Seagrave
-
Engineers Name Manual Input (if not available in list above)
-
Anyone found at risk please indicate name and give details of the risk
-
Has a dynamic risk assessment been completed to stage required?
-
Has all hazards been identified? (If no make comments)
-
If a planned job has the leading engineer done a plan and are they on target?
Working At Height
-
Has the permit been completed by the site supervisor and filled out correctly?
-
What is the permit number reference? (If answered yes to the above?)
-
Are people aware of the details in the method statement?
-
Is everyone working safe?
-
Is the access safe
PPE
-
Head Protection - Safety Helmet
-
Eye Protection - goggles or glasses
-
Hand Protection - Gloves
-
Hearing Protection - plugs / muffs
-
Foot Protection - safety boots (steel toe capped)
Manual Handling
-
Correct Body Position
-
Awkward Bending/Leaning/Twisting/Squatting
-
Weight Under individuals capability for Solo Lift (guideline 25kg max for average person)
Are Engineers In Line Of Fire?
-
Hand/Body
-
Overhead Hazards - falling objects
-
Rotating Equipment
-
Pinch/Sharp Edges
Housekeeping
-
Waste/Debris on the floor
-
Cables/Hoses Orderly
-
Area cordoned off
-
Warning boards displayed
Tool Use
-
Correct Tools and used safely
-
Are the tools used in good condition (all compliant?)
-
Have electrical items got an in date PAT Test label on?
-
Damage to Cables or Tools
Procedures
-
Are Safe Working Procedures followed?
-
Lockout/Tagout Procedures Followed (isolations?)
-
Are Guards on all tools and machines
Nearby Work
-
Aware of Vehicle Traffic
-
Aware of Work Performed in Vicinity
Notes
-
Positive Feedback or Corrective Action
-
Comments
-
Add Pictures
-
Sketch
Signatures
-
Inspector signature