Information
-
STORE NAME:
-
STORE No.
-
INSTALLATION DATE :-
-
ADDRESS:
SURVEY INFORMATION
General Details
-
Type of Ceiling:
-
Till numbers being removed from main bank:
-
Main Bank till numbers being removed:
-
Quantity of Basket Tills to be moved:
-
Quantity of Self Scan Tills to be moved:
-
Quantity of new Self Scan tills being installed:
-
Is a Catalyst switch required?
Data Details
-
Which IT Data cabinet supplies self scans?
-
Location of Data Cabinet:
-
Is Data fed from ceiling or under floor fed?
-
Quantity of additional data cables required:
-
Do you require additional patch panel?
-
Is Data cable STP/ UTP?
POWER DETAILS
-
Which consumer board supplies?
-
Location of consumer board:
-
Were you able to access consumer board at survey?
-
MCBs labelled?
- Yes
- No
-
MCB Reference that supplies checkouts:
-
Is power fed from ceiling or under floor fed?
-
Zs reading at time of the survey if possible:
Cisco Hardware Requirements
-
Have all cabinets been accessed to check for spare port availability?
-
Have you carried out a 'Remote Port check' (Cisco Eng)?
MDF 3500: Please provide the number of spare ports that are available within the specific data cabinets (visual check):
-
S/W 1
-
PORT NOs AVAILABLE:
-
S/W 2
-
PORT NOs AVAILABLE:
-
S/W 3
-
PORT NOs AVAILABLE:
-
S/W 4
-
PORT NOs AVAILABLE:
-
New Switch Required?
IDF 1: Please provide the number of spare ports that are available within the specific data cabinets (visual check):
-
S/W 1
-
PORT NOs AVAILABLE:
-
S/W 2
-
PORT NOs AVAILABLE:
-
S/W 3
-
PORT NOs AVAILABLE:
-
S/W 4
-
PORT NOs AVAILABLE:
-
New Switch Required?
IDF 2: Please provide the number of spare ports that are available within the specific data cabinets (visual check):
-
S/W 1
-
PORT NOs AVAILABLE:
-
S/W 2
-
PORT NOs AVAILABLE:
-
S/W 3
-
PORT NOs AVAILABLE:
-
S/W 4
-
PORT NOs AVAILABLE:
-
New Switch Required?
IDF 3: Please provide the number of spare ports that are available within the specific data cabinets (visual check):
-
S/W 1
-
PORT NOs AVAILABLE:
-
S/W 2
-
PORT NOs AVAILABLE:
-
S/W 3
-
PORT NOs AVAILABLE:
-
S/W 4
-
PORT NOs AVAILABLE:
-
New Switch Required?
Access Requirement Details
Access Equipment Details
-
Lifter type required?
-
Weekend or Midweek?
-
Quantity required of each lifter selected?
Engineer Requirements
-
Standard Dual Resource - 1 x Data/Hardware + 1 x Electrician
-
Quantity required:
-
Additional Electrical Engineer - Standard on Critical Layouts
-
Quantity required:
-
Additional Engineer due to additional tills/scope change
-
Quantity required:
-
ADDITIONAL INFORMATION:
Photographs:
-
Add media
-
ISG Technology Surveyor