Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Receiving Information

  • Enter date and time the item arrived at Site

  • Shipping service used

  • Tracking number

Product Information

  • Enter the contents of the package.

Site Product QAQC

  • Product shippment received in good order free of damage

  • Do you need to do a tubing/tool pre unloading inspection?

  • Is tubing/tool free from any external damage?

  • Was tubing/tool provided with all protective caps?

  • Are all threads free from debris and defects?

  • Item
  • Description:

  • Does the item require an engineering inspection confirmation?

  • Is the engineering drawing for the item in our database or is it available?

  • Part number

  • Revision number

Engineering Design

  • Matches form tool shape?

  • QR ID matches?

  • Surface finish correct? (Exterior)

  • Surface finish correct? (Interior)

  • Does the part geometry match the CAD drawing?

  • Is material thickness accurate as specified?

  • Multi-cavity: all cavities checked?

  • Strength tested?

  • Rev A released?

  • Assembly functions as intended?

  • Assembly docs released?

Inspection finalization

  • Vendor notified of defects or inconsistencies?

  • Notes:

  • Final action taken:

  • Receiver

  • Select date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.