Title Page

  • Site Name

  • Conducted on

  • Prepared by

  • Task Number

1.0 General Information

  • NOTIFY CONTROL ROOM PRIOR TO MAINTENANCE ACTIVITY

  • Minor Repairs to be rectified during service

  • Major repairs to be documented on checklist and form forwarded to Water Infrastructure Services.

  • Site Overview

2.0 Fluoride Dosing Station

Dose Pump Motor Test

  • Total number of dosing pumps on site?

Dose Pump 1

Winding Continuity (Ω)

  • A

  • B

  • C

Insulation Resistance (MΩ)

  • A

  • B

  • C

Tong Test Running Load (A)

  • A

  • B

  • C

Phase Check Motor (V)

  • No Load

  • A-B

  • B-C

  • A-C

  • Load

  • A-B

  • B-C

  • A-C

Checklist

  • Check Fuses

  • Check Power Lead Condition

Dose Pump 2

Winding Continuity (Ω)

  • A

  • B

  • C

Insulation Resistance (MΩ)

  • A

  • B

  • C

Tong Test Running Load (A)

  • A

  • B

  • C

Phase Check Motor (V)

  • No Load

  • A-B

  • B-C

  • A-C

  • Load

  • A-B

  • B-C

  • A-C

Checklist

  • Check Fuses

  • Check Power Lead Condition

Winding Continuity (Ω)

  • A

  • B

  • C

Insulation Resistance (MΩ)

  • A

  • B

  • C

Tong Test Running Load (A)

  • A

  • B

  • C

Phase Check Motor (V)

  • No Load

  • A-B

  • B-C

  • A-C

  • Load

  • A-B

  • B-C

  • A-C

Checklist

  • Check Fuses

  • Check Power Lead Condition

3.0 Main Switchboard

  • Check Labelling

  • Check Lighting

  • Check Fuses and RCD's

  • Check Alarm Faults to SCADA

  • Back up Battery Voltage and Condition

  • Test Station Communication System

  • Check and Tighten all Connections

  • Clean Cabinet

4.0 PAC Dosing Station

Raw Water Booster Pump Motor Testing

  • Total number of raw water booster pumps on site?

Raw Water Booster Pump 1

Winding Continuity (Ω)

  • A

  • B

  • C

Insulation Resistance (MΩ)

  • A

  • B

  • C

Tong Test Running Load (A)

  • A

  • B

  • C

Phase Check Motor (V)

  • No Load

  • A-B

  • B-C

  • A-C

  • Load

  • A-B

  • B-C

  • A-C

Checklist

  • Check Fuses

  • Check Power Lead Condition

  • Check Flow Switch

  • Check Solenoid Valve

Raw Water Booster Pump 1

Winding Continuity (Ω)

  • A

  • B

  • C

Insulation Resistance (MΩ)

  • A

  • B

  • C

Tong Test Running Load (A)

  • A

  • B

  • C

Phase Check Motor (V)

  • No Load

  • A-B

  • B-C

  • A-C

  • Load

  • A-B

  • B-C

  • A-C

Checklist

  • Check Fuses

  • Check Power Lead Condition

  • Check Flow Switch

  • Check Solenoid Valve

Raw Water Booster Pump 2

Winding Continuity (Ω)

  • A

  • B

  • C

Insulation Resistance (MΩ)

  • A

  • B

  • C

Tong Test Running Load (A)

  • A

  • B

  • C

Phase Check Motor (V)

  • No Load

  • A-B

  • B-C

  • A-C

  • Load

  • A-B

  • B-C

  • A-C

Checklist

  • Check Fuses

  • Check Power Lead Condition

  • Check Flow Switch

  • Check Solenoid Valve

5.0 Dilution Chamber

Dilution Chamber

  • Check Operation of Float Switch

Transfer Pump Outlet Assembly

  • Check Thermal Flow Switch 1

  • Check Thermal Flow Switch 2

Dose Pump Motor Test

  • Total number of dosing pumps on site?

Dose Pump 1

Winding Continuity (Ω)

  • A

  • B

  • C

Insulation Resistance (MΩ)

  • A

  • B

  • C

Tong Test Running Load (A)

  • A

  • B

  • C

Phase Check Motor (V)

  • No Load

  • A-B

  • B-C

  • A-C

  • Load

  • A-B

  • B-C

  • A-C

Checklist

  • Check Fuses

  • Check Power Lead Condition

Dose Pump 2

Winding Continuity (Ω)

  • A

  • B

  • C

Insulation Resistance (MΩ)

  • A

  • B

  • C

Tong Test Running Load (A)

  • A

  • B

  • C

Phase Check Motor (V)

  • No Load

  • A-B

  • B-C

  • A-C

  • Load

  • A-B

  • B-C

  • A-C

Checklist

  • Check Fuses

  • Check Power Lead Condition

Winding Continuity (Ω)

  • A

  • B

  • C

Insulation Resistance (MΩ)

  • A

  • B

  • C

Tong Test Running Load (A)

  • A

  • B

  • C

Phase Check Motor (V)

  • No Load

  • A-B

  • B-C

  • A-C

  • Load

  • A-B

  • B-C

  • A-C

Checklist

  • Check Fuses

  • Check Power Lead Condition

6.0 Switchboards

  • Check Labelling

  • Check Lighting

  • Check Fuses and RCD's

  • Check Alarm Faults to SCADA

  • Back up Battery Voltage and Condition

  • Test Station Communication System

  • Check and Tighten all Connections

  • Clean Cabinet

7.0 Completed and Future Work

  • Completed Work

  • Work to be Completed

Signature

  • Tradesman and Signature

  • Tradesman and Signature

  • Tradesman and Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.