Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Personnel in attendance

1.0 Documents and Administration Requirements

  • 1.1 Have all corrective actions from previous inspections been closed out?

  • 1.2 Is a Construction Phase plan available for the site?

  • 1.3 Are Risk Assessments and Method Statements (RAMS) available for activities being undertaken? List main activities.

  • 1.4 Are processes in place for accidents and incident reporting and recording?

  • 1.5 Does the site have displayed/available the following:

  • F10

  • HASAW Notice

  • Emergency Contact Details

  • Employers Liability Insurance Certificate

  • Sign In/Out Book

  • 1.6 Have all employees and visitors signed In and Out of site?

2.0 Housekeeping and Site Layout

  • 2.1 Are all access areas clear and adequate width?

  • 2.2 Are all safety signs clear and appropriate for activities being undertaken?

  • 2.3 Is the site clean and well maintained?

  • 2.4 Are tools and equipments put away after use?

  • 2.5 Are construction materials adequately stored?

  • 2.6 Is the site secure to prevent unauthorised access?

  • 2.7 When in use are mobile generators adequately ventilated and fuelled?

3.0 First Aid

  • 3.1 Are approved First Aiders easily identified and correct ratio for site. List First Aiders.

  • 3.2 Is an adequate first aid kit and eye wash for the activity being undertaken on site?

  • 3.3 Is the First Aid box well stocked, in date and prominently displayed?

4.0 Welfare and Amenities

  • 4.1 Have adequate toilets, washing and drying facilities been provided?

  • 4.2 Is a seating area with tables available for employees to take a meal break?

  • 4.3 If required are ladies toilets available for use?

  • 4.4 Can all toilets be flushed and are there arrangements in place for emptying/replacing?

  • 4.5 Is adequate heating and lighting provided for use in relation to seasons?

  • 4.6 Are the welfare facilities been kept clean?

  • 4.7 Is there a supply of drinking water ( hot & cold ) on site?

  • 4.8 Are there facilities for drying clothing and getting changed?

5.0 Noise

  • 5.1 Have noisy processes and tasks been identified in RAMS and daily Risk Assessments?

  • 5.2 Are there effective control measures in place to reduce exposure to noise?

  • 5.3 Is PPE provided/available and is it being used correctly?

6.0 Manual Handling

  • 6.1 Are manual handling activities being carried out correctly by site personnel?

7.0 Control of Substances Harmful to Health - COSHH

  • 7.1 Are all substances labelled with product name, risks and safety phrase?

  • 7.2 Is a COSHH register maintained and filled in correctly?

  • 7.3 Are COSHH Assessments being conducted and recorded?

  • 7.4 Are substances being handled in accordance with the RA and exposure levels controlled?

  • 7.5 Are hazardous substances stored correctly?

8.0 Fire Prevention and Protection

  • 8.1 Is there appropriate and clearly marked fire fighting equipment on site?

  • 8.2 Is the fire fighting equipment fit for task? Tested and in date?

  • 8.3 Is there a designated fire assembly point clearly marked on site?

  • 8.4 Are designed smoking areas identified and aware to the workforce?

  • 8.5 Is the fire alarm sufficient for the site conditions and can it be heard throughout the site?

  • 8.6 Is the Fire & Emergency Action Plan available on site?

  • 8.7 Are escape route clearly marked, safe and unobstructed?

9.0 Underground Services

  • 9.1 Is there evidence that underground services information is in use on site?

  • 9.2 Is the CAT scanner and Genny approved for use and within calibration date?

  • 9.3 Is the CAT and Genny user competent and current?

  • 9.4 Is there a signed and correctly used 'permit to dig' in place?

  • 9.5 Have all underground services been identified and marked up correctly?

10.0 Excavations and Trenching

  • 10.1 Where applicable are all underground services isolated?

  • 10.2 Has ground stability been checked and control measures implemented?

  • 10.3 Are barriers in place to prevent falling into excavations?

  • 10.4 Is the shoring appropriate to the activity being undertaken?

  • 10.5 Has adequate and suitable access and egress been provided

  • 10.6 If ladders are provided, are they erected and secured correctly and in date and tagged

  • 10.7 Has suitable edge protection been provided for excavations?

11.0 Concreting

  • 11.1 Has formwork been constructed as per design?

  • 11.2 Are weather conditions appropriate for concrete activities?

  • 11.3 Is there suitable and appropriate access and egress for concrete delivery?

  • 11.4 Has a suitable concrete washout area been provided?

  • 11.5 Is the correct PPE issued and in use during concrete activities?

12.0 Scaffolding, Working Platforms & Working at Heights

  • 12.1 Are scaff-tags in place and in date with 7 day inspections completed

  • 12.2 Is there safe access & egress to platforms including handrails & toe boards?

  • 12.3 Is the area cordoned off to prevent persons walking under the platform?

  • 12.4 Are all employees on platform using the correct PPE and are clipped on?

  • 12.5 Is working at Height carried out in a safe manner and in compliance with the safe system of work?

  • 12.6 Are all openings and voids protected or guarded?

  • 12.7 Is all access equipment in a safe and efficient condition, being used correctly and for it's intended purpose?

  • 12.8 Is there evidence of access equipment being inspected and checked?

13.0 Plant and Equipment

  • 13.1 Is the plant in use suitably maintained and fit for purpose?

  • 13.2 Is the operator of the plant a competent person?

  • 13.3 Are warning alarms and lights fitted and in working order?

  • 13.4 Is a competent banks man used during reversing operations and blindsides?

  • 13.5 When not in use are ignition keys removed and vehicle secured?

  • 13.6 Are parking and movements in accordance with site traffic plan?

  • 13.7 Are fitted fire extinguishers in date and suitable?

  • 13.8 Are drip trays in use under static plant and equipment?

  • 13.9 Are generators correctly earthed or RCD protected?

  • 13.10 Are power/hand tools safe, appropriate, well maintained and used correctly?

14.0 Portable Electric Equipment

  • 14.1 Is there evidence of Portable Appliance Testing (PAT)?

  • 14.2 Is all portable electrical equipment operated at low voltage ( 110v )?

  • 14.3 Is all portable electrical equipment tagged to show date of next inspection?

15.0 Traffic Management

  • 15.1 Is the traffic management plan in accordance with New Roads and Street act (NRSWA)?<br>

  • 15.2 Is all signage serviceable and suitable for the intended task?

  • 15.3 Are protection arrangements in place suitable?

  • 15.4 Are all employees adhering to the traffic management plan?

16.0 Climate

  • 16.1 Have climate conditions been considered and control measures in place?

  • 16.2 As adequate PPE been issued and used correctly?

17.0 Lifting Equipment & Lifting Accessories

  • 17.1 Is all lifting equipment on site certified and in date?

  • 17.2 Are all lifting accessories certified and in date?

  • 17.3 Are all lifting accessories displaying correct tags?

  • 17.4 Are all lifting activities been carried out on stable ground?

  • 17.5 Is there an appropriate Lifting Plan in place for all lifting activities?

18.0 Training & Induction

  • 18.1 Are all employees and visitors to site inducted and signed onto record sheets?

  • 18.2 Are briefings and toolbox talks being carried out and recorded?

  • 18.3 Are all employees' competency records available on site?

19.0 Behaviour & Attitude

  • 19.1 Was a positive H&S attitude observed during inspection?

  • 19.2 Are all the employees displaying positive working practices?

  • 19.3 Are all employees aware of the hazards involved and the emergency procedures?

20.0 Personal Protective Equipment (PPE)

  • 20.1 Are employees wearing the minimum expected PPE?

  • 20.2 Is specific to task PPE ( as stated in RAMS) available and in use?

  • 20.3 Is the condition of PPE satisfactory?

21.0 Incident Reporting

  • 21.1 Have all incidents, accidents and near misses reported and processed correctly?

  • 21.2 Is the site manager aware of the RIDDOR requirements?

Closeout

  • Site Manager comments:

  • Site Manager:

  • Auditor comments:

  • Auditor:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.