Title Page
-
RCA & Suburb
-
Road Name & Road ID
-
CAR / WAP No.
-
TTM Level
-
Date & Time
-
Conducted by
-
Location
-
Instructions
1. Fill out any needed information on the blank spaces
2. Select the best response for the items with the given choices below
3. Add photo, comments & notes by clicking on the paperclip icon
4. To add corrective actions to any item with issues, click on the paperclip icon then "Add Action", provide a description, assign to a member, set priority and due date
5. Complete the audit by providing digital signature
6. Share your report by exporting as PDF, Word, Excel or Web Link
Operational Details
-
• Activity description
-
• TTM method
-
• TTM Contractor
-
• Contractor- working space
-
• Client / Principal
Signs
-
A1 - Missing <br><br>• Sign
-
A2 - Position <br><br>• Sign
-
A3 - Not visible/fallen over <br><br>• Sign
-
A4 - Wrong sign <br><br>• Sign
-
A5 - Condition unacceptable <br><br>• Sign
-
A6 - Permanent sign <br><br>• Sign
-
A7 - Unapproved sign used / too small <br><br>• Sign
-
A8 - Non-compliant support / sign too low <br><br>• Support
Mobile & Semi-Static
-
B1 - Tail pilot vehicle/AWVMS omitted or incorrect location <br><br>• Vehicle
-
B2 - Lead pilot vehicle omitted or incorrect location <br><br>• Vehicle
-
B3 - Shadow vehicle omitted or incorrect location <br><br>• Vehicle
-
B4 - TMA missing or non-compliant <br><br>• TMA
-
B5 - AWVMS/arrowboard non-compliant <br><br>• Vehicle
Pedestrians / Cyclists
-
C1 - Inadequate provision for pedestrians <br><br>• Feature
-
C2 - Inadequate provision for cyclists <br><br>• Feature
Delineation
-
D1 - Missing or ineffective taper Leading <br><br>• Taper
-
D2 - Tapers too short Leading <br><br>• Taper
-
D3 - Taper too short or missing Trailing <br><br>• Taper
-
D4 - Spacing in taper <br><br>• Taper 5
-
D5 - Spacing along lanes <br><br>• Per 100m
-
D6 - Missing or ineffective delineation along lanes <br><br>• Per Section
-
D7 - Condition unacceptable <br><br>• Device
-
D8 - Using non-approved device <br><br>• Device
-
D9 - Road marking incorrect at long-term level 2 or 3 roads <br><br>• Site
-
D10 - Inadequate/missing site access <br><br>• Access
Miscellaneous
-
E1 - Working in live lanes <br><br>• Individual
-
E2 - Missing or ineffective controller <br><br>• Individual
-
E3 - Safety zone compromised <br><br>• Individual
-
E4 - High visibility garment not acceptable <br><br>• Individual
-
E5 - Marginal surface condition (carriageway only) <br><br>• Occasion
-
E6 - Unacceptable surface condition (peds, cyclists or carriageway) <br><br>• Occasion
-
E7 - Barrier defects (missing or incorrect components) <br><br>• Component
-
E8 - Unsafe or redundant TTM <br><br>• Equipment
-
E9 - VMS message incorrect or inappropriate <br><br>• VMS
-
E10 - Flashing beacons / indicator lights not used or ineffective <br><br>• Vehicle
-
E11 - Parking / stopping features not relocated <br><br>• Feature
-
E12 - Unsafe and illegal parking of plant/equip. <br><br>• Feature
-
E13 - Marginal items (signs, delineators, Hi vis garments) <br><br>• Feature
Other Worksite Aspects
-
G1 - Qualified person on site [refer to A5 of CoPTTM]
-
G2 - TSL appropriate [refer to C4 of CoPTTM]
-
G3 - Road user flow acceptable
-
G4 - On-site record [form must include STMS authority, 2 hourly checks and TSL details]
-
G5 - TMP approved?
-
G6 - Approved TMP sighted?
-
G7 - Approved TMP applicable?
-
G8 - TTM in accordance with approved TMP?
Result & Findings
-
Rate
-
Site fixed?
-
Has site activity been ceased?
-
Site activity ceased by
Key Points & Actions
-
Complaint callout
-
Site Activity Status
-
Audit / Review
-
Notification to RCA
-
Good site induction
-
TMP design issues
-
Low Risk
-
General Key Point Notes
-
General Action Notes
STMS Details
-
Received by (Name and Signature)
-
SCR left onsite?
-
STMS Name
-
Qualifications
-
NZTA ID No.
-
STMS Mobile No.
Audit / Review Completion & Sign-Off
-
Auditor's Name and Signature
-
NZTA ID No.
-
Qualifications
-
Auditor Mobile No.