Information
-
Site conducted
-
Client :
-
Contractor:
-
Location:
-
Date/Time:
Site Information
HEALTH AND SAFETY CONSIDERATIONS DISCUSSED
-
Maps Provided and Discussed
-
What are the high risk areas?
-
High risk areas identified, discussed and marked on the map?
-
What are the environmental issues?
-
What are the operator issues ?
-
Emergency Assembly Point
-
Physical GPS Coordinates
Site Risk Assessment
-
Add Hazard
-
Risk Matrix
-
Hazard
-
Initial Risk Rating
- E - (Extreme Risk) - If an incident was to occur, it would likely be permanent, debilitating injury or death would result
- H - (High Risk) If an accident was to occur, it would be likely that an injury requiring medical treatment would result
- M - (Moderate Risk) If an incident was likely to occur, there would be some chance that an injury would result
- L - (Low Risk) If an incident was to occur, there would be little likelihood that an injury would result
-
Controls (How are we going to reduce this Risk? Eliminate, Minimise)
-
Residual Risk Rating - after the controls are in place
- E - (Extreme Risk) - If an incident was to occur, it would likely be permanent, debilitating injury or death would result
- H - (High Risk) If an accident was to occur, it would be likely that an injury requiring medical treatment would result
- M - (Moderate Risk) If an incident was likely to occur, there would be some chance that an injury would result
- L - (Low Risk) If an incident was to occur, there would be little likelihood that an injury would result
-
Controls Hierachy
- Eliminate
- Substitution
- Isolation
- Engineering
- Administration
- PPE
-
Photo of Hazard (if required)
Confirm Understanding
-
Foreman Signature
-
Supervisor Signature
Add signature
-
Additional Signature