Title Page
-
Employee Name
-
Employee Role
-
Staff Member who's overseeing this employee
First Shift - (Employee has completed their paperwork)
-
Signed copy of their contract (IEA) before they begin work
-
Signed copy of their code of conduct
-
Personal details form is completed
-
TAX declaration form completed
-
Kiwisaver form completed
-
Police vetting form completed
-
2 forms of ID are copied
-
All paperwork has been sent to Assistant Manager
-
Assistant Manager has sent all paperwork to HR
Inductions (Complete both H&S and site specific inductions with new employees)
-
H&S induction completed
-
Site specific induction completed
-
HR induction completed
Operating procedures (Employee to spend their first day reading the NOP, EAP, EEP, BVL Policies, SDS folder)
-
Normal operating procedures (new employee to sign)
-
Emergency operating procedures (new employee to sign)
-
Emergency evacuation procedures (new employee to sign)
-
Bay Venues Policies (new employee to sign)
-
Safety data sheet folder (new employee to sign)
-
Staff member who's witnessed the new employee reading all policies/procedures
Second Shift
Envibe training (can be done using Envibe training mode)
-
How to count and set up the morning float
-
How to process a normal transaction (general entry)
-
How to set up a visit pass from scratch
-
How to set up an annual membership from scratch
-
How to set up a LTS membership
-
How to assign a membership tag to a customers membership
-
How to search a customers name, and tag in manually
-
How to process a cash refund
-
How to process a eftpos refund
-
How to remove a sale
-
How to add a discount
-
College count button
-
How to process a manual eftpos transaction
-
How to arrive bookings for the day/check bookings
Water Testing (Staff to demonstrate with new employee)
-
Show new employee through the water testing excel spreadsheet on the iPad
-
Where we collect water samples in the pool
-
How to check the TDS and water temperature
-
FAC test (explain what FAC means, and why we test it before carrying it out - include highest/lowest/desirable levels)
-
TAC test (explain what TAC means, and why we test it before carrying it out - include highest/lowest/desirable levels)
-
CAC (explain what CAC means, and why we test it before carrying it out - include highest/lowest/desirable levels)
-
PH test (explain what PH is, and why we test it before carrying it out - include highest/lowest/desirable levels)
-
Alkalinity test (explain what Alkalinity is, and why we test it before carrying it out - include highest/lowest/desirable levels)
-
Hardness test (explain what Hardness is, and why we test it before carrying it out - include highest/lowest/desirable levels)
-
TDS (explain what TDS is, and why we test it before carrying it out - include highest/lowest/desirable levels)
-
Staff member demonstrating the water tests
Water Testing (Staff to get new employee to carry out, while observing)
-
FAC test
-
TAC test
-
CAC test
-
PH test
-
Alkalinity test
-
Hardness test
-
TDS test
-
Water temperature
-
Making changes to the dose pump
-
COMPLETE THE BELOW SOPs
-
Complete Water Test SOP
-
Complete Alkalinity Test SOP
-
Complete Hardness Test SOP
-
New employee to sign off once complete
-
Staff member observing to sign once complete
Plant Room (Staff to take new employee through the plant check)
-
Plant check (point out the labels as you carry out the plant check)
-
Where the chemicals are kept
-
Chemicals & what each chemical is used for
-
Chemicals & what PPE is required for each
-
How to operate the dose pump
-
Where the salt bin is kept
-
Where the chemicals are stored/which chemicals can't be stored together
-
Adding salt
-
Adding perlite
-
Cleaning spilled chemicals
-
Where PPE is kept
-
Where the SDS folder is kept
-
Where the chemical inventory is kept
-
COMPLETE THE BELOW SOPs
-
Complete Adding Salt SOP
-
Complete Adding Perlite SOP
-
Chemicals SOP
-
New employee to sign once complete
-
Staff member to sign once complete
Third Shift (Opening/closing)
Opening procedures
-
Show new employee how to disarm the alarm
-
Clocking in to begin work
-
Setting up the changing rooms/checking toilet supplies and cleanliness
-
Refer to opening procedures run sheet on the iPad
-
COMPLETE THE BELOW SOPs
-
Complete the opening procedure SOP
Closing procedures
-
How to arm the alarm
-
Refer to closing procedures run sheet on the iPad
-
COMPLETE THE BELOW SOPs
-
Complete closing procedure SOP
SOP's & Training
Shift Leaders must sign the training sections, once training has been completed
-
Pool Hoist one on one training
-
Pool Hoist SOP completed
-
Accessible ladder training
-
AED Training
-
AED SOP complete
-
Adding perlite SOP complete
-
Alkalinity SOP complete
-
Calcium Hardness Test SOP complete
-
Chemicals SOP complete
-
Facility closing SOP complete
-
Facility opening SOP complete
-
Faecal/Vomit Training
-
Faecal/Vomit SOP complete
-
**SL's ONLY** Filter Backwash Training (Trained SL's/Supervisor or Ass. Manager to sign off)
-
**SL's ONLY** Filter backwash SOP complete
-
Water Test SOP complete
-
Plant room cleaning training
-
Plant room cleaning SOP complete
-
Pool Hall Fogging/Condensation training
-
Pool Hall Fogging/Condensation SOP complete
-
Inflatable training
-
Inflatable SOP complete
-
New employee to sign once all training/SOPs are completed