Information
-
Site conducted
-
Document No.
-
Site
-
Project Number
-
Conducted on
-
Prepared by
-
Location
Scheme Details
-
Extent of Scheme (from/ to)
-
Anticipated Start date?
-
Any notes? (i.e. Scaffolding in place until....)
-
Add some photos
Welfare location
-
Is Welfare required?
-
Location from
-
Location to
-
Take a photo of the Welfare location
-
Are parking suspensions required?
Parking Suspension
-
Parking suspension same as Phase from/ to?
-
Parking suspension from
-
Parking suspension to
-
How many bays are required?
-
Is a separate compound location required?
-
Take a photo of the compound location
-
Location from
-
Location to
-
Are parking suspensions required?
Parking Suspension
-
Parking suspension same as Phase from/ to?
-
Parking suspension from
-
Parking suspension to
-
How many bays are required?
Phases
Phases
-
Insert a new phase
Phase
-
From
-
To
-
What is the paving material?
- New ASP
- Re-Lay ASP
- New Yorkstone
- Re-Lay Yorkstone
- Asphalt
- Other
-
What is the sub-base material?
-
Is work to the kerbs required?
-
What is the length of kerb in this phase?
-
What is the width of footway in this phase?
-
What is the m2 of footway in this phase?
-
Notes?
-
Take some photos of the phase
-
Expected duration for this phase?
-
Add Parking Suspensions if required
Parking Suspension
-
Parking suspension same as Phase from/ to?
-
Parking suspension from
-
Parking suspension to
-
How many bays are required?