Title Page
-
Date
-
Auditor Name & Employer
-
Location
INSPECTION DETAILS
-
Job Title of Auditor
-
Company Inspected
-
Sub-contractor Team Name/REF
-
Sub-contractor Management/Supervision
-
Gang Lead Operative
-
No. of Operatives On-Site
-
Sub-contractor Vehicle Registration
-
Permit No. (Confirmation Check via Street Manager)
-
Job REF
1 Cable/Fibre Works
-
Are the Works Able to Continue Under Initial Conditions?
1.0 Site Safety
-
Is PPE Being Worn & Appropriate to Works Undertaken?
-
Is Eye Wash & First Aid Provision Present, In Date & Replenished?
-
Are All Operatives Clear on the Welfare Arrangements? (Confirm Location)
-
Are All Operatives Clear on the NGE CPP & Emergency Preparedness Plan, and Where to Locate?
-
Are Gas Cylinders Secure & Stored Correctly? (If Appl)
-
Are Hand Tools in Good Condition?
-
Are Power Tools in Good Condition? (Incl Certification of Condition/Maintenance Evidence)
-
Are Vibrating Tools in Good Condition, Assessed & Tagged?
-
Is All CAT & Genny Equipment Calibrated & in Good Condition? (Operatives to Demonstrate Use)
-
Are All GDU's Calibrated, In Use & In Good Condition?
-
Are the Correct Chamber Keys, Pit Lifters & Chamber Related Equipment On-Site & in Good Condition?
2 Work Pack & Site Documentation
-
Are All Safe Digging/Stats Available & In Date?
-
Is the Job Pack Available (Digital OR Hard Copy) & Operatives Can Demonstrate Use?
-
Are All Relevant RAMS In Place & Signed by the Operatives? (Digital OR Hard Copy) (Sample Operatives Knowledge)
-
Is the Daily Risk Assessment In Place & Signed by the Operatives? (Digital OR Hard Copy) (Samply Operatives Knowledge)
3 SSOW
-
Are All HSG47 Guidelines Being Adhered to? (Safe Digging Practices Live)
-
Have All CAT & Genny Processes Been Carried Out Prior to Works? (Images of Marked Services)
-
Are All Excavations Free from Excess Water?
-
Is All Excavated Material/Spoil Away from the Excavation?
-
Is the Site Clean & Tidy? (Free from Slip/Trip Hazards)
4 Cabling
4.1 External Cabling
-
Are the Cable Routes Identified & Confirmed as Accurate?
-
Is the Cable Spec being Adhered to?
-
Is the Cabelling Labelling & Management being Adhered to?
-
Have the Cable Tests Taken Place & Results Been Recorded?
-
Has All Cabling Waste Been Disposed of Appropriately?
-
Has the Back Rope Been Installed?
4.2 Optical Fibre Splicing
-
Has the Splice Been Labelled/Marked?
-
Have the Heatshrinks/Seals Been Fitted Accurately?
-
Have the Fibres/Tubes Been Numbered?
-
Has the Splicing Taken Place as per Design?
-
Are the Desciant Packs in Place?
-
Are the Fibres Cleaned?
-
Are the Fibres Correctly in the Cassette?
-
Are the In/Out Cables Labelled Correctly?
-
Is the Joint Secured to the Bearers?
-
Is the Box/Pit Adequate Size?
-
Is there a Vertical Stress Loop Every 10M?
-
Splice Tray Fitted & Labelled Accurately?
CLOSE OUT
-
Name of Auditor