Title Page

  • Date

  • Auditor Name & Employer

  • Location

INSPECTION DETAILS

  • Job Title of Auditor

  • Company Inspected

  • Sub-contractor Team Name/REF

  • Sub-contractor Management/Supervision

  • Gang Lead Operative

  • No. of Operatives On-Site

  • Sub-contractor Vehicle Registration

  • Permit No. (Confirmation Check via Street Manager)

  • Job REF

1 Civils

  • Are the Works Able to Continue Under Initial Conditions?

1.0 Site Safety

  • Is PPE Being Worn & Appropriate to Works Undertaken?

  • Is Eye Wash & First Aid Provision Present, In Date & Replenished?

  • Are All Operatives Clear on the Welfare Arrangements? (Confirm Location)

  • Are All Operatives Clear on the NGE CPP & Emergency Preparedness Plan, and Where to Locate?

  • Are Gas Cylinders Secure & Stored Correctly? (If Appl)

  • Are Hand Tools in Good Condition?

  • Are Power Tools in Good Condition? (Incl Certification of Condition/Maintenance Evidence)

  • Are Vibrating Tools in Good Condition, Assessed & Tagged?

  • Is All CAT & Genny Equipment Calibrated & in Good Condition? (Operatives to Demonstrate Use)

  • Are All GDU's Calibrated, In Use & In Good Condition?

  • Are the Correct Chamber Keys, Pit Lifters & Chamber Related Equipment On-Site & in Good Condition?

2 Vehicles

  • Do All Vehicles On-Site have Appropriate Beacons & Chevrons?

  • Are All Vehicles Clean & Tidy Internally? (Storage Areas w/Equipment Must Be Checked & Clear)

  • Are All Vehicles Parked Appropriately?

3 Work Pack & Site Documentation

  • Are All Safe Digging/Stats Available & In Date?

  • Is the Job Pack Available (Digital OR Hard Copy) & Operatives Can Demonstrate Use?

  • Are All Relevant RAMS In Place & Signed by the Operatives? (Digital OR Hard Copy) (Sample Operatives Knowledge)

  • Is the Daily Risk Assessment In Place & Signed by the Operatives? (Digital OR Hard Copy) (Samply Operatives Knowledge)

4 SSOW

  • Are All HSG47 Guidelines Being Adhered to? (Safe Digging Practices Live)

  • Have All CAT & Genny Processes Been Carried Out Prior to Works? (Images of Marked Services)

  • Are All Excavations Free from Excess Water?

  • Is All Excavated Material/Spoil Away from the Excavation?

  • Is the Site Clean & Tidy? (Free from Slip/Trip Hazards)

5 Street Works

  • Permit Boards In Place at Either End of the Site?

  • Permit Boards Show All Relevant Detail? (Point of Contact, Telephone Numbers)

  • Is There an NRSWA Accredited Operative On-Site?

  • Is the SLG in Accordance with the ACOP?

  • Is the Relevant Barrier/Cones Available & In Place in Accordance with the SLG Set-up?

  • Is All Equipment Used for the SLG In Good Condition?

  • Is the Relevant Pedestrian Provision In Place? (If Appl) (Kerb Ramps Incl)

6 People Plant Interface

  • Are All Accreditations of Operatives On-Site Relevant to the Plant In Use?

  • Are Maintenance Records Readily Available for all Plant On-Site?

  • Plant Pre-Use Checks Completed?

  • Is All Plant On-Site Fit for Purpose?

  • Are Spill Kits Readily Available for all Plant?

7 Vital Safety Rules

  • Are All Operatives Aware of the NGE Vital Safety Rules? Are They Being Adhered to?

Close Out

Signature

  • Name of Auditor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.