1 Civils
-
Are the Works Able to Continue Under Initial Conditions?
1.0 Site Safety
-
Is PPE Being Worn & Appropriate to Works Undertaken?
-
Is Eye Wash & First Aid Provision Present, In Date & Replenished?
-
Are All Operatives Clear on the Welfare Arrangements? (Confirm Location)
-
Are All Operatives Clear on the NGE CPP & Emergency Preparedness Plan, and Where to Locate?
-
Are Gas Cylinders Secure & Stored Correctly? (If Appl)
-
Are Hand Tools in Good Condition?
-
Are Power Tools in Good Condition? (Incl Certification of Condition/Maintenance Evidence)
-
Are Vibrating Tools in Good Condition, Assessed & Tagged?
-
Is All CAT & Genny Equipment Calibrated & in Good Condition? (Operatives to Demonstrate Use)
-
Are All GDU's Calibrated, In Use & In Good Condition?
-
Are the Correct Chamber Keys, Pit Lifters & Chamber Related Equipment On-Site & in Good Condition?
2 Vehicles
-
Do All Vehicles On-Site have Appropriate Beacons & Chevrons?
-
Are All Vehicles Clean & Tidy Internally? (Storage Areas w/Equipment Must Be Checked & Clear)
-
Are All Vehicles Parked Appropriately?
3 Work Pack & Site Documentation
-
Are All Safe Digging/Stats Available & In Date?
-
Is the Job Pack Available (Digital OR Hard Copy) & Operatives Can Demonstrate Use?
- Yes
- No
- N/A
-
Are All Relevant RAMS In Place & Signed by the Operatives? (Digital OR Hard Copy) (Sample Operatives Knowledge)
-
Is the Daily Risk Assessment In Place & Signed by the Operatives? (Digital OR Hard Copy) (Samply Operatives Knowledge)
4 SSOW
-
Are All HSG47 Guidelines Being Adhered to? (Safe Digging Practices Live)
-
Have All CAT & Genny Processes Been Carried Out Prior to Works? (Images of Marked Services)
-
Are All Excavations Free from Excess Water?
-
Is All Excavated Material/Spoil Away from the Excavation?
-
Is the Site Clean & Tidy? (Free from Slip/Trip Hazards)
5 Street Works
-
Permit Boards In Place at Either End of the Site?
-
Permit Boards Show All Relevant Detail? (Point of Contact, Telephone Numbers)
-
Is There an NRSWA Accredited Operative On-Site?
-
Is the SLG in Accordance with the ACOP?
-
Is the Relevant Barrier/Cones Available & In Place in Accordance with the SLG Set-up?
-
Is All Equipment Used for the SLG In Good Condition?
-
Is the Relevant Pedestrian Provision In Place? (If Appl) (Kerb Ramps Incl)
6 People Plant Interface
-
Are All Accreditations of Operatives On-Site Relevant to the Plant In Use?
-
Are Maintenance Records Readily Available for all Plant On-Site?
-
Plant Pre-Use Checks Completed?
-
Is All Plant On-Site Fit for Purpose?
-
Are Spill Kits Readily Available for all Plant?
7 Vital Safety Rules
-
Are All Operatives Aware of the NGE Vital Safety Rules? Are They Being Adhered to?