Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
FSC on site during clearing activities?
-
Grading conducted within the approved ROW?
-
Has 100mm of topsoil been cleared?
-
Are soil stockpiles less than 1.5m high?
-
Is the area outside the ROW free from stockpiled soil?
-
Have timber and branches been cleared from the ROW and stockpiled on the edge?
-
Are soil stockpiles free from contaminates?
-
Are soil stockpiles free from erosion?
-
Are there gaps in the soil stockpiles that allow the movement of fauna/vehicles?
-
Are there drainage breaks in the soil stockpiles?
-
Are weed hygiene locations signposted?
-
Do all vehicles have current weed hygiene certificates?
-
Are hazardous materials being used and stored in accordance with SDS regulations?
-
Does the crew have a spillkit?
-
Have lateral berms been installed across the ROW at watercourse crossings?
-
If required, have ESC measures been installed around watercourses?
-
No re-fuelling has been conducted within 100m of a watercourse
-
Have pre-clearance surveys been completed and documented?
-
Are habitat features being marked or flagged?
-
Is the approved clearing technique as per the Vegetation Clearing Procedure being adhered to?
-
Where required, are pole cameras being used to inspect hollows?
-
Are habitat features being retained where possible?
-
Are heritage monitors onsite for all ground disturbance activities?
-
Are vehicles and machinery fitted with fire extinguishers?
-
Vehicles refrain from parking in long grass where possible?
-
Are water trucks or 1000L furphy on site?
-
Is smoking only occurring in designated locations?
-
Are post clearance inspections being conducted and recorded in the daily report?
-
Is there an erosion and sediment control team following behind clear and grade?