Information

NJS Roofing Inspection

  • Document No.

  • Client / Project Name

  • Location
  • Phase / Unit / Plot No.

  • Conducted on

  • Prepared by

Main Roofs / Low Roofs

  • Check no rips in underlay.

  • What action has been or will be be taken?

  • Inspector Sign Off of Action Complete

  • Underlay sagged between rafters approx 10-15mm

  • What action has been or will be taken?

  • Inspector Sign Off of Action Complete

  • Ensure underlay is approx 30mm short of ridge line both sides

  • What action has been or will be taken?

  • Inspector Sign Off of Action Complete

  • Sufficient Clearance has been provided between windows and brick sills in accordance with Building Regulations (Timber Frame)

  • What action has been or will be taken?

  • Inspector Sign Off of Action Complete

  • Rockwool over party walls, between battens and wall plate (if required) including garages

  • What action has been or be taken?

  • Inspector Sign Off of Action Complete

  • Jointing of battens on rafters to suit gauge of battens - literature given

  • What action has been or will be taken?

  • Inspector Sign Off of Action Complete

  • Tiles to be fixed to specification as instructed

  • What action has been or will be taken?

  • Inspector Sign Off of Action Complete

  • Crow clips to be used with large format tiles at secret gutter / dormer abutments

  • What action has been or will be taken?

  • Inspector Sign Off of Action Complete

  • End ridge / hips - Ensure additional fixing used

  • What action has been or will be taken?

  • Inspector Sign Off of Action Complete

  • Check dry ridge / hip screws are fastened thoroughly

  • What action has been or will be taken?

  • Inspector Sign Off of Action Complete

  • Ensure wet verge clips are fastened thoroughly

  • What action has been or will be taken?

  • Inspector Sign Off Action Complete

  • No small cuts to verges (Roof can be lined to avoid this)

  • What action has been or will be taken?

  • Undercloak to be between 40mm - 50mm overhang

  • What action has been or will be taken

  • Inspector Sign Off Action Complete

  • Ensure coverage sufficient to Velux / Dormers to front, sides and top

  • What action has been or will be taken

  • Check lead saddle to bottom of valley expels water into guttering - especially where intersects verges

  • What action has been or will be taken

  • Inspector Sign Off Action Complete

  • Ensure first soaker on plain tiles are long enough to cover eave tile

  • What action has been or will be taken?

  • Check side coverage where first valley meets eaves, add lead saddle if required

  • What action has been or will be taken?

  • Inspector Sign Off of Action Complete

  • Plain tiles - ALL perimeters to be nailed plus course specification

  • What action has been or will be taken?

  • Ensure mortar works are to an acceptable standard

  • What action has been or will be taken?

  • Inspector Sign Off of Action Complete

  • Ensure vent tiles / slates are fitted where stated. On site roofers' responsibility to liaise with site office

  • What action has been or will be taken?

  • Inspector Sign Off of Action Complete

  • Scaffolding / working areas to be left clean - Materials removed to storage area

  • What action has been or will be taken?

  • Inspector Sign Off of Action Complete

  • Bird beaks to bonnets - Literature given

  • What action has been or will be taken?

  • Inspector Sign Off of Action Complete

  • Tile slips to ridge at verge - literature given

  • What action has been or will be taken?

  • Inspector Sign Off of Action Complete

Leadworks

  • Ensure stepped lead flashing's are positioned suitably under trays (do not fit if trays are positioned wrong)

  • What action has been or will be taken?

  • Inspector Sign Off of Action Complete

  • Ensure cover flashing's are under trays / DPC

  • What action has been or will be taken?

  • Inspector Sign Off of Action Complete

  • Ensure lead mastic works are undertaken to an acceptable standard

  • What action has been or will be taken?

  • Inspector Sign Off of Action Complete

  • All lead work treated with patination oil

  • What action has been or will be taken?

  • Inspector Sign Off of Action Complete

Tile Hanging

  • Winchester cuts to be nailed and adhered (mastic) to avoid rattling

  • What action has been or will be taken?

  • Inspector Sign Off of Action Complete

  • All tiles double nailed

  • What action has been or will be taken?

  • Inspector Sign Off of Action Complete

Inspection Sign Off

  • Name and Position of Person Carrying Out the Inspection

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.