Information
NJS Roofing Inspection
-
Document No.
-
Client / Project Name
-
Location
-
Phase / Unit / Plot No.
-
Conducted on
-
Prepared by
Main Roofs / Low Roofs
-
Check no rips in underlay.
-
What action has been or will be be taken?
-
Inspector Sign Off of Action Complete
-
Underlay sagged between rafters approx 10-15mm
-
What action has been or will be taken?
-
Inspector Sign Off of Action Complete
-
Ensure underlay is approx 30mm short of ridge line both sides
-
What action has been or will be taken?
-
Inspector Sign Off of Action Complete
-
Sufficient Clearance has been provided between windows and brick sills in accordance with Building Regulations (Timber Frame)
-
What action has been or will be taken?
-
Inspector Sign Off of Action Complete
-
Rockwool over party walls, between battens and wall plate (if required) including garages
-
What action has been or be taken?
-
Inspector Sign Off of Action Complete
-
Jointing of battens on rafters to suit gauge of battens - literature given
-
What action has been or will be taken?
-
Inspector Sign Off of Action Complete
-
Tiles to be fixed to specification as instructed
-
What action has been or will be taken?
-
Inspector Sign Off of Action Complete
-
Crow clips to be used with large format tiles at secret gutter / dormer abutments
-
What action has been or will be taken?
-
Inspector Sign Off of Action Complete
-
End ridge / hips - Ensure additional fixing used
-
What action has been or will be taken?
-
Inspector Sign Off of Action Complete
-
Check dry ridge / hip screws are fastened thoroughly
-
What action has been or will be taken?
-
Inspector Sign Off of Action Complete
-
Ensure wet verge clips are fastened thoroughly
-
What action has been or will be taken?
-
Inspector Sign Off Action Complete
-
No small cuts to verges (Roof can be lined to avoid this)
-
What action has been or will be taken?
-
Undercloak to be between 40mm - 50mm overhang
-
What action has been or will be taken
-
Inspector Sign Off Action Complete
-
Ensure coverage sufficient to Velux / Dormers to front, sides and top
-
What action has been or will be taken
-
Check lead saddle to bottom of valley expels water into guttering - especially where intersects verges
-
What action has been or will be taken
-
Inspector Sign Off Action Complete
-
Ensure first soaker on plain tiles are long enough to cover eave tile
-
What action has been or will be taken?
-
Check side coverage where first valley meets eaves, add lead saddle if required
-
What action has been or will be taken?
-
Inspector Sign Off of Action Complete
-
Plain tiles - ALL perimeters to be nailed plus course specification
-
What action has been or will be taken?
-
Ensure mortar works are to an acceptable standard
-
What action has been or will be taken?
-
Inspector Sign Off of Action Complete
-
Ensure vent tiles / slates are fitted where stated. On site roofers' responsibility to liaise with site office
-
What action has been or will be taken?
-
Inspector Sign Off of Action Complete
-
Scaffolding / working areas to be left clean - Materials removed to storage area
-
What action has been or will be taken?
-
Inspector Sign Off of Action Complete
-
Bird beaks to bonnets - Literature given
-
What action has been or will be taken?
-
Inspector Sign Off of Action Complete
-
Tile slips to ridge at verge - literature given
-
What action has been or will be taken?
-
Inspector Sign Off of Action Complete
Leadworks
-
Ensure stepped lead flashing's are positioned suitably under trays (do not fit if trays are positioned wrong)
-
What action has been or will be taken?
-
Inspector Sign Off of Action Complete
-
Ensure cover flashing's are under trays / DPC
-
What action has been or will be taken?
-
Inspector Sign Off of Action Complete
-
Ensure lead mastic works are undertaken to an acceptable standard
-
What action has been or will be taken?
-
Inspector Sign Off of Action Complete
-
All lead work treated with patination oil
-
What action has been or will be taken?
-
Inspector Sign Off of Action Complete
Tile Hanging
-
Winchester cuts to be nailed and adhered (mastic) to avoid rattling
-
What action has been or will be taken?
-
Inspector Sign Off of Action Complete
-
All tiles double nailed
-
What action has been or will be taken?
-
Inspector Sign Off of Action Complete
Inspection Sign Off
-
Name and Position of Person Carrying Out the Inspection
-
Signature