Information

  • Client / Site

  • Description of areas of scaffolding inspected

  • Specific Elevations or Areas

  • Conducted on

  • Prepared by

  • Location

Scaffold Inspection Report

Design Standard

  • TG20:13 Compliance sheets, bespoke design drawings or Manufacturers Instructions available?

  • Have the Scaffolds been built in accordance with the relevant standard?

  • Detail what action is to be taken

Foundations

  • Are the ground conditions provided by the client suitable for the imposed loads?

  • If not, detail the recommended action to be taken

  • Are sole boards in place the correct dimensions and in good order?

  • If not, detail the recommended action to be taken

  • Have base plates or jacks been used?

Standards

  • Are the standards correctly plum and within the allowed erection tolerance?

  • Are the joints staggered as per TG20 guidance?

  • Detail what action is to be taken

  • Are the standard spacing's to Table 1 of TG20 and within the allowable erection tolerance?

  • If not, what action is to be taken

Ledgers

  • Are the Ledgers level and within the allowed TG20 erection tolerance?

  • If, what action can be taken?

  • Are the joints staggered in accordance with TG20 guidance?

  • If not, what action can be taken?

  • Are the lift heights within the allowed erection tolerance?

Transoms

  • Are the transoms of the correct length and do they protrude 25mm past the coupler?

  • Provide information on what action is required if any

  • Is there a transom fitted within 300mm of the node point at ledger braced standards?

  • If not, is any further action required

  • Are the transoms spaced correctly on boarded and non boarded lifts? (1.2m max)

  • If not, what action is required?

Ledger, Façade and Plan Bracing

  • Is all bracing connected within 300mm of the node point?

  • If not, provide recommended action to be taken

  • Is all bracing set at the correct intervals?

  • If not, provide recommended action to be taken

  • Is all bracing connected using load bearing fittings?

  • If not, provide recommended action to be taken

Ties

  • Are all ties been set at the frequency of the compliance sheets or design drawing?

  • If not, what action is required to achieve compliance

  • Have proof pull tests been carried out?

  • If not, investigate why this has not happened and take necessary action

  • Where ties cannot be used are other systems in place to adequately restrain the scaffold?

  • Provide information on any necessary action required.

Boarded Lifts

  • Are the boards in good condition with no excessive splits, or notches or other damage?

  • Is the working platform free from gaps and trip hazards?

  • Are internal gaps more than 225mm?

  • What remedial action is to be taken?

  • Are gaps between inside boards and main decks more than 50mm?

  • What remedial action is to be taken?

  • Are all boards 2.13m and under secured prevent movement?

  • Are inside standards flush with the platform or extend 1mtr above the working platform?

  • Are trip hazards present?

  • What additional measures are required to minimise risks of trips or falls?

  • Are all inside boards secured to prevent movement?

  • Are the boards supported at least 50mm past their last support but not exceeding 150mm?

  • If not, what remedial actions are required?

  • Are self-closing gates or ladder traps fitted and used correctly at all ladder access locations?

  • If not, what actions are to be taken?

Handrails, Toe Boards & Brick Guards

  • Are Handrails and toe boards fitted where there is a risk of persons or materials falling?

  • What action is to be taken?

  • Are the handrails at the correct height 950mm with a gap not exceeding 470mm between the toe board and the handrails?

  • If not, what action is to be taken?

  • Are the handrails fixed on load bearing couplers and toe boards correctly secured at two fixing points?

  • If not, what action is required?

  • Are the brick guards in good condition and correctly secured?

  • If not, what action is required?

Ladder/ System Staircase

  • Have ladder towers been erected in accordance with the TG20 guidance?

  • If not, what remedial action is required?

  • Are the ladders on a firm and even base and supported only by the stiles?

  • If not, what action is to be taken?

  • Are the ladders correctly secured in accordance with NASC Guidance at the top of the ladders using approved methods?

  • If not, what action is required?

  • Do the ladders protrude at least 1 mtr above the working platform? where this is not possible is there an adequate handhold provided?

  • If not, what action is to be taken?

  • Are ladders free from significant defects or damage?

  • If not, what action is to be taken?

  • Are the stair treads in sound condition and free from hazards that could cause harm?

  • If not, what action is to be taken?

  • Are the stair treads fixed securely with no movement?<br>

  • If not, what action is to be taken?

  • Are all the landings complete with Handrails and toe boards?

  • If system staircases are provided, have these been erected and tied in accordance with the MIM's

  • If not, provide details of remedial action to be taken

Loading Bays

  • Have the loading bays been erected in accordance wit the design provided or a manufacturers instruction manual?

  • If not, what remedial action is required?

  • Has the appropriate loading signage been fixed to the loading bay?

  • If not, what action is to be taken?

  • Is the opening gate, brick guards and toe boards all in good order?

  • If not, what action is to be taken?

Bridging

  • Has bridging been installed in accordance with TG20:13 guidance or as per any bespoke design?

  • If not, what remedial action is required?

Special Structures

  • Have any Non-TG20 or non-standard scaffolds been erected in accordance with a bespoke design?

  • What remedial actions are required?

Housekeeping

  • Are materials and equipment stored in a safe manner?

  • If specific hazards are present, report issues to the site manager or relevant supervisor

Signage & Barriers

  • Is appropriate signage fixed to the scaffolding: Loading Bay Signage; Incomplete Signage etc.

  • Are suitable Physical Barriers in use?

SG4:15

  • Has the scaffold been erected in accordance with SG4:15?<br>Are there single guardrails on all non working lifts, sufficient transoms on non-working lifts.<br>Is there a ladder access or other safe means of access/egress in place for the scaffold erectors to use?

  • If non-compliance with SG4 is noted this report should be referred to the H&S manager for review.

Inspector Sign Off

  • Name

  • Position / Competence

  • Signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.