Audit Information

  • Site

  • Location
  • Conducted on

  • Prepared by

  • Personnel present for audit

Project Information

  • Project Number

  • Project Manager

  • Site Supervisor

  • Scope of works

  • Project progress (%)

Scoring Information

  • Rating Scale Compliance
    0 Unacceptable 0-25% Immediate action required/ Major non-compliance
    1 Poor 25% Attention required before the end of the day
    2 Fair 50% Attention required within the next 2 days
    3 Acceptable 75% Minimal rectification required
    4 Good 100% No action required


    Based on:
    0 Potential for serious injury/ major damage to equipment
    1 Likelihood for an incident occurring
    2 General non-compliance with legal or site safety requirements
    3 Compliance substantial but not 100%
    4 All areas satisfy both legal and site safety requirements


    Not applicable:
    * - Not Applicable - To be placed in appropriate section when not being audited


    Audit Target
    80% +

General Comments

  • General Comments

  • OHS Comments

  • Environmental Comments

  • Quality Assurance Comments

  • Target Improvements

Job Site Information (Reg 3.2/3.10) and Communication

  • Site specific Management Plan on site?

  • Observation

  • Add media

  • Name and location of emergency and medical services for the project posted?

  • Observation

  • Add media

  • Name of key personnel on site for the project posted?

  • Observation

  • Add media

  • Emergency/Evacuation procedures posted including an evacuation plan and site specific emergency flow charts been established and displayed?

  • Observation

  • Add media

  • Is the Major Incident flowchart displayed?

  • Observation

  • Add media

  • Is there an emergency and first aid checklist (Form F8.48) and when was it last reviewed?

  • Observation

  • Add media

  • Name of the first aider posted?

  • Observation

  • Add media

  • Have emergency drills been executed? Form F8.64

  • Observation

  • Add media

  • Name of the Health and Safety Representative posted?

  • Observation

  • Add media

  • Are company policies displayed in site office and crib room?

  • Observation

  • Add media

  • Is relevant OHS information displayed in the site office and crib room or readily available to all personnel

  • Observation

  • Add media

  • Have all site personnel and subcontractors received a site induction?

  • Observation

  • Add media

  • Is there a construction "Blue/White Card" induction register on site and is it being used?

  • Observation

  • Add media

  • Is there photocopied records of relevant training/licences for personnel who carry out specific tasks and/or high risk activities?

  • Observation

  • Add media

  • Site inspections conducted and recorded. Copies kept on site?

  • Observation

  • Add media

  • Emergency evacuation point identified and displayed on the notice board and site office

  • Observation

  • Add media

  • Access to copies of Act 1984 and Regs 1996 on site?

  • Observation

  • Add media

  • Are toolbox meetings held and allow site personnel to participate in the safety effort

  • Observation

  • Add media

  • Are safety and environmental meetings held and documented?

  • Observation

  • Add media

  • Are safety and environmental issues requiring follow up recorded and/or discussed and/or evaluated at the monthly meeting.

  • Observation

  • Add media

First Aid Facilities and Amenities (Reg 3.7/3.11)

  • Easy access to first aid box and register

  • Observation

  • Add media

  • Contents clean, orderly, stocked and labelled

  • Observation

  • Add media

  • Toilets clean, supply of soap, hand towels, toilet paper (Male/Female)

  • Observation

  • Add media

  • Trades aware of first aid box location and procedure

  • Observation

  • Add media

  • Facility easily identified - Green cross displayed outside of site office

  • Observation

  • Add media

  • Clean lunch room with adequate supply of water and facilities

  • Observation

  • Add media

  • Fridge and microwave clean

  • Observation

  • Add media

  • Bins not overflowing

  • Observation

  • Add media

Accident/Incident

  • Is there an accident/incident register and is it up to date?

  • Observation

  • Add media

  • Are accident/incidents report and recorded on form F8.47? Are accidents/incident investigated where required and the results recorded on Form F8.01?

  • Observation

  • Add media

  • Is the accident/incident followed up and recorded? Are corrective actions implemented where required?

  • Observation

  • Add media

  • Are accident/incidents statistics recorded on daily OHS&E statistical spreadsheet and is spreadsheet up to date?

  • Observation

  • Add media

  • Brief description of incidents for the month and record of LTIs and MTIs

Site Conditions (Reg 3.7/3.11)

  • Are all access points onto site clear and unobstructed e.g. General building material and rubbish

  • Observation

  • Add media

  • Construction warning signage at each site entry

  • Observation

  • Add media

  • Hard hat signage

  • Observation

  • Add media

  • Footwear signage

  • Observation

  • Add media

  • Eye protection signage (if required)

  • Observation

  • Add media

  • Hearing protection signage (if required)

  • Observation

  • Add media

  • Hi-Vis vest worn (if required)

  • Observation

  • Add media

  • Electrical tagging signage

  • Observation

  • Add media

Public Safety (OSH Act Sec 20-22)

  • Construction material kept within the workplace. Public area not obstructed.

  • Observation

  • Add media

  • No risk of objects falling into public areas

  • Observation

  • Add media

  • No trip hazards to the public

  • Observation

  • Add media

  • Site perimeter fencing or barriers erected

  • Observation

  • Add media

  • Roads unobstructed, permits and signage in place

  • Observation

  • Add media

Hazard Identification

  • Are identified significant hazards recorded on the Project Risk Assessment and a Risk Register prepared where required?

  • Observation

  • Add media

  • Have design risk assessments been obtained and reviewed?

  • Observation

  • Add media

  • Job Safety Analysis for work being carried out in the project in place

  • Observation

  • Add media

  • Have the JSAs been monitored and reviewed?

  • Observation

  • Add media

  • If not which one require reviewing?

  • Are JSAs provided by subcontractors for specific hazardous tasks

  • Observation

  • Add media

  • We're the JSA participants involved in the preparation and review of the JSA prior to the job starting and all operatives involved in the task signed onto the JSA

  • Observation

  • Add media

  • Was the JSA referred to during the job and were the job steps followed and effective?

  • Observation

  • Add media

Personal Protective Equipment (Reg 3.32/3.44)

  • Is Visitor PPE supplied

  • Observation

  • Add media

  • Training in correct use, maintenance, etc of PPE

  • Observation

  • Add media

  • Trades wearing eye protection, safety harness, hard hats, safety footwear, hearing protection, safety gloves and Hi-Vis vests (as required)

  • Observation

  • Add media

Electrical (Reg 3.59/3.65 and AS3012)

  • Permanent live boards lockable

  • Observation

  • Add media

  • Temporary power box tagged and numbered

  • Observation

  • Add media

  • Temporary construction power to box tagged

  • Observation

  • Add media

  • Covers used correctly and leads through the bottom of the box

  • Observation

  • Add media

  • Insulated tie bars in place

  • Observation

  • Add media

  • Electrical tools/leads with current testing and tagging and in good condition

  • Observation

  • Add media

  • Electrical leads raised off the ground by at least 2m

  • Observation

  • Add media

  • Electrical register available on site and filled out

  • Observation

  • Add media

  • Power located within 30 metres of work area (no piggy backing)

  • Observation

  • Add media

  • Proof of Dial Before You Dig and/or scanning report available on site

  • Observation

  • Add media

  • Permit provided to work near overhead power lines or underground services

  • Observation

  • Add media

  • Overhead power lines identified

  • Observation

  • Add media

  • Electrical danger poster displayed

  • Observation

  • Add media

  • Correct extinguishers on site

  • Observation

  • Add media

  • Correct step ladders in use for electrical work

  • Observation

  • Add media

  • Step ladders used correctly

  • Observation

  • Add media

  • Isolation permits and isolation log in place

  • Observation

  • Add media

Fire Prevention and Protection (Reg 3.9)

  • Access/exits clear and clearly signposted

  • Observation

  • Add media

  • Fire extinguishers accessible (around the amenities) and easily identifiable

  • Observation

  • Add media

  • Are fire extinguishers strategically located around the site , easily identifiable and readily accessible?

  • Observation

  • Add media

  • Are fire extinguishers the right type for the hazard and have relevant operating instructions

  • Observation

  • Add media

  • Hydrants clear of materials

  • Observation

  • Add media

  • Do fire extinguishers have an up to date inspection tag (6 months)

  • Observation

  • Add media

  • Are fire detection control measures in place if required and what are they

  • Observation

  • Add media

Welding and Cutting (Reg 3.94)

  • Have all subcontractors carried out a risk assessment for the hot works they are carrying out

  • Observation

  • Add media

  • Hot work permit systems available and in place as required

  • Observation

  • Add media

  • Good housekeeping maintained

  • Observation

  • Add media

  • Double flash back arrestors fitted and current tagging on welder

  • Observation

  • Add media

  • Equipment in good condition

  • Observation

  • Add media

  • Verify that oxy/acetylene gas bottles are fitted with flashback arresters (at cylinder end for hoses <3 metres. Cylinder and hand piece/torch end for hoses >3 metres)

  • Observation

  • Add media

  • During welding are screens in place?

  • Observation

  • Add media

  • Is there adequate signage in place to warn others of dangers of welding?

  • Observation

  • Add media

  • Has the area for hot works been barricaded off

  • Observation

  • Add media

Hand Held Power Tools (Reg 3.6)

  • Proper tools for the job

  • Observation

  • Add media

  • Tools in good condition and all safety guards fitted

  • Observation

  • Add media

  • RCD protection in place

  • Observation

  • Add media

  • Petrol driven tools not used in poorly ventilated areas

  • Observation

  • Add media

  • Petrol driven and concrete cutting tools used in accordance with manufacturer's instructions and Code of Practice

  • Observation

  • Add media


  • http://www.commerce.wa.gov.au/WorkSafe/PDF/Codes_of_Practice/Code_concrete_masonr.pdf

  • Drilling & Cutting Permit in place for coring and chasing?

  • Observation

  • Add media

  • Spotter/barricading, warning signage below slab for coring works

  • Observation

  • Add media

  • Warning signage for laser use in place?

  • Observation

  • Add media

  • Work area barricaded off when laser in use?

  • Observation

  • Add media

Explosive Powered Tools and Nail Guns (Reg 4.50/4.51)

  • Regulations known and being complied with

  • Observation

  • Add media

  • Competent instruction and supervision being carried out while EPTO is in use

  • Observation

  • Add media

  • Operator wearing eye and ear protection

  • Observation

  • Add media

  • Warning signs erected and in place

  • Observation

  • Add media

  • Area isolated and/or barricaded

  • Observation

  • Add media

Mobile Plant

  • Bobcat tractor/forklift used in accordance with manufacturer's instructions, in good/serviceable condition and clean

  • Observation

  • Add media

  • Are guards in place where required and are they effective

  • Observation

  • Add media

  • Are SWLs, capacities, tolerances, etc known for equipment, displayed and complied with

  • Observation

  • Add media

  • Is mobile plant operated well clear of overhead power lines?

  • Observation

  • Add media

  • Is mobile plant operated by trained, competent and certified operators

  • Observation

  • Add media

  • Manufacturer's instructions available and log book completed

  • Observation

  • Add media

  • Are relevant records available for plant being operated on site - plant risk assessment, mobilisation checklist, JSA and daily/weekly checklists

  • Observation

  • Add media

  • Is the plant and equipment register available and up to date?

  • Observation

  • Add media

Hoists

  • Hoists have overhead operators protection

  • Observation

  • Add media

  • Hoist properly erected and operated

  • Observation

  • Add media

  • Hoists have base level guard rails

  • Observation

  • Add media

  • Safe access and egress to hoist working platform

  • Observation

  • Add media

  • Hoists have log books available

  • Observation

  • Add media

  • Hoist has isolating device e.g. key

  • Observation

  • Add media

  • Hoists have all upper levels with guard rails fitted

  • Observation

  • Add media

  • Is person certified to operate hoist above 11m or competent to operate hoist under 11m

  • Observation

  • Add media

  • Hoist above 11 metres fitted with sign nominating authorised certificated person only and names the person.

  • Observation

  • Add media

Elevated Working Platforms

  • EWP log book available and completed

  • Observation

  • Add media

  • Are relevant documents and records such as plant risk assessment, mobilisation checklist, inspections, JSAs and maintenance records available

  • Observation

  • Add media

  • EWP's sited on firm and level ground

  • Observation

  • Add media

  • EWP operator trained and have they a high risk licence if operating a boom type EWP

  • Observation

  • Add media

  • Are harnesses being worn in EWPs/cherry pickers

  • Observation

  • Add media

  • Are SWLs, capacities and and tolerances, etc known for relevant equipment, displayed and complied with

  • Observation

  • Add media

  • Are EWP's kept clean and in a serviceable condition

  • Observation

  • Add media

Mobile Crane

  • Crane has log book, maintenance records and Worksafe certification available

  • Observation

  • Add media

  • Crane with flashing lights, alarms, outriggers?

  • Observation

  • Add media

  • Crane inspection regularly carried out by competent person (daily inspection)

  • Observation

  • Add media

  • When crane is in operation is it located on compacted or stabilised ground

  • Observation

  • Add media

  • When crane is in operation is the crane and movement of the crane jib well clear of any overhead power lines

  • Observation

  • Add media

  • Is there a means of restriction or control to prevent persons entering te area or vicinity in which a crane is operating?

  • Observation

  • Add media

  • Has operator and dogman/rigger relevant high risk licences?

  • Observation

  • Add media

  • Are slings and chains in good condition and tagged

  • Observation

  • Add media

  • Is there a lifting register in place

  • Observation

  • Add media

Tower Crane

  • Clear of unnecessary personnel when lifting loads

  • Observation

  • Add media

  • Crane operators and riggers have clear communication method

  • Observation

  • Add media

  • Has operator and dogman/rigger got relevant high risk licences?

  • Observation

  • Add media

  • Has the daily checklist been completed and documented? Have the safety devices been checked?

  • Observation

  • Add media

  • Is there documentation to show the crane box, first aid cage and kibble have the appropriate certification and SWL marking on them

  • Observation

  • Add media

  • Is all the crane documentation available on site to indicate the crane complies with the legislative requirements

  • Observation

  • Add media

  • Are slings and chains in good condition and tagged

  • Observation

  • Add media

  • Is there a lifting register in place

  • Observation

  • Add media

Hazardous Substances and Dangerous Goods

  • Is there a current (five year) MSDS available for all hazardous substances on site and register in place

  • Observation

  • Add media

  • Access to register and MSDS sheets by employees

  • Observation

  • Add media

  • Are subcontractors complying with MSDS in their SWMS

  • Observation

  • Add media

  • Are risk assessments with the JSAs/SWMS

  • Observation

  • Add media

  • Is there a sign off by the subcontractors showing all employees working with hazardous substances have been trained in the MSDS

  • Observation

  • Add media

  • Is there appropriate storage available for Hazardous Substances on site

  • Observation

  • Add media

  • Verify that there is a fire extinguisher with oxy/acetylene gas bottles while they are being used

  • Observation

  • Add media

  • Verify that gas bottles are stored in a cage while not in use and that the gas bottles are stored separately

  • Observation

  • Add media

  • Synthetic fibres controlled in accordance with MSDS

  • Observation

  • Add media

Road Traffic Management and Management of Site Vehicles

  • Reversing vehicles controlled by trained spotters

  • Observation

  • Add media

  • Traffic management plan available on site

  • Observation

  • Add media

  • Traffic movement in accordance with the plan implemented on the site

  • Observation

  • Add media

  • Is all signage in good condition and free from vandalism/tampering

  • Observation

  • Add media

  • System to control movement of traffic onsite (site specific management plan in place and is displayed)

  • Observation

  • Add media

  • Operators of vehicles properly trained

  • Observation

  • Add media

  • Safe unloading of vehicles implemented on the site

  • Observation

  • Add media

  • Does the traffic management plan need to be reviewed for current or future works

  • Observation

  • Add media

Excavations

  • Adequate access into the excavation e.g. Ladders/ramp

  • Observation

  • Add media

  • Shoring in place and adequate for the purpose

  • Observation

  • Add media

  • Is the depth of the excavation greater than 1.5 metres and if so has risk assessment been carried out

  • Observation

  • Add media

  • Is there an observer present when workers are in an excavation at least 1.5 m deep

  • Observation

  • Add media

  • Excavations greater than 1.5 metres benched, battered or shored

  • Observation

  • Add media

  • Adequate barriers erected around the excavations

  • Observation

  • Add media

  • Spoil heaps near excavations edge

  • Observation

  • Add media

  • Stacking of material near excavation edge

  • Observation

  • Add media

  • Passing traffic near excavation edge

  • Observation

  • Add media

  • Is the stability of buildings/structures adjacent to an excavation maintained

  • Observation

  • Add media

  • Permit system in place for excavation

  • Observation

  • Add media

  • Diagrams showing locations of utility services

  • Observation

  • Add media

Housekeeping (Reg 3.17)

  • Regular disposal of rubbish

  • Observation

  • Add media

  • Passageways, walkways and access ways clear of building material

  • Observation

  • Add media

  • Adequate lighting for task

  • Observation

  • Add media

  • Bins provided

  • Observation

  • Add media

  • Reo-steel capped

  • Observation

  • Add media

  • Work areas tidy

  • Observation

  • Add media

  • Slip, trip and fall hazards identified

  • Observation

  • Add media

  • Chutes used for waste disposal in good working condition

  • Observation

  • Add media

  • Barriers at the base to restrict others from entering bin areas

  • Observation

  • Add media

  • Bins covered to contain dust and debris

  • Observation

  • Add media

  • Rubbish removed by mechanical means

  • Observation

  • Add media

Working At Heights (Reg 3.48 - 3.57)

  • Has a risk assessment been carried out before commencement of any work at heights

  • Observation

  • Add media

  • Are harnesses required to be worn and is there a rescue procedure in place

  • Observation

  • Add media

  • If harnesses in use and do anchor points comply with relevant Australian standards

  • Observation

  • Add media

  • Is PPE inspected an maintained and all fall restraint register established

  • Observation

  • Add media

  • Has safe access been provided - Stair or ladder access

  • Observation

  • Add media

  • Is edge protection erected to comply with regulations

  • Observation

  • Add media

  • Are all materials secured from movement

  • Observation

  • Add media

  • Are all trades trained and holding current certificate for Working at Heights

  • Observation

  • Add media

  • Are there guard rails on all stairs and above ground level landings and fixed platform

  • Observation

  • Add media

  • Is there a permit system in place for Working at Heights

  • Observation

  • Add media

  • Are any holes or openings in any floor appropriately covered, have appropriate signage "Danger Hole Beneath" and / or is protected using guard rails

  • Observation

  • Add media

Scaffold (Reg 3.67/3.74)

  • Scaffolds properly constructed to AS 1576.1.6

  • Observation

  • Add media

  • Is scaffold erected by a certified scaffolder

  • Observation

  • Add media

  • As there handover certificates or checklists in place

  • Observation

  • Add media

  • Is scaffold erected on a stable foundation and secured to the structure in accordance with the code of practice

  • Observation

  • Add media

  • Standards on concrete fitted with base plates

  • Observation

  • Add media

  • Standards with screw jacks and sole boards

  • Observation

  • Add media

  • Scaffold tied in to prevent collapse of scaffold (adequate bracing in place)

  • Observation

  • Add media

  • Edge protection in place for all scaffolding over 2 metres in height

  • Observation

  • Add media

  • Kick boards/mesh guards fitted to platforms

  • Observation

  • Add media

  • Sheeted or netted scaffolds fitted with additional ties to resist wind loads

  • Observation

  • Add media

  • Tagging system on scaffolds above 4 metres (scaffold sign off)

  • Observation

  • Add media

  • Tagging system fitted on each access point (access ladder)

  • Observation

  • Add media

  • Tagging system legible, durable and up to date

  • Observation

  • Add media

  • Warning signs/barriers in place for incomplete scaffolds

  • Observation

  • Add media

  • Planks secured from uplift/movement

  • Observation

  • Add media

  • Working platforms fully decked

  • Observation

  • Add media

  • Platforms of a suitable width for the work being carried out

  • Observation

  • Add media

  • Safe access provided to working platform

  • Observation

  • Add media

  • During construction of the scaffold is the immediate area around the base barricaded off or otherwise controlled to minimise risk of injury from falling objects

  • Observation

  • Add media

  • Is there protection for scaffold within 6 metres of electrical conductors?

  • Observation

  • Add media

  • Loading bays evenly distributed with loads? SWL sign fitted?

  • Observation

  • Add media

  • Are harnesses required for the tasks being carried out

  • Observation

  • Add media

  • Have scaffold trades completed a Working at Heights Course

  • Observation

  • Add media

Mobile Scaffold (Reg 3.67/3.74)

  • Mobile scaffold complies with suppliers specifications

  • Observation

  • Add media

  • Mobile with equipment and components in place

  • Observation

  • Add media

  • Edge protection with top rail, mid rail and kick board fitted for mobile scaffold above 2m

  • Observation

  • Add media

  • Mobile with ladder correctly fitted

  • Observation

  • Add media

  • Scaffold braced correctly

  • Observation

  • Add media

  • Tagging system on scaffolds above 4 metres (scaffold sign off)

  • Observation

  • Add media

  • Tagging system fitted on each entry point (access ladder)

  • Observation

  • Add media

  • Tagging system legible, durable and up to date

  • Observation

  • Add media

  • Are there checklists in place

  • Observation

  • Add media

  • Warning signs/barriers in place for incomplete scaffolds

  • Observation

  • Add media

  • Castors fitted and locked

  • Observation

  • Add media

  • Working platforms fully decked

  • Observation

  • Add media

  • Outriggers/ties fitted where required

  • Observation

  • Add media

Ladders / Step Ladders (Reg 3.26)

  • Are ladders erected and compliant with regulations

  • Observation

  • Add media

  • Are access ladders appropriate and secured at the top and bottom

  • Observation

  • Add media

  • Do ladders extend a minimum of 1m above the platform

  • Observation

  • Add media

  • Are ladders angled at the correct distance from the structure to be accessed, 1 out and 4 up

  • Observation

  • Add media

  • Are ladders maintained in good condition

  • Observation

  • Add media

  • Are all step ladders auto locking and/or platform ladders

  • Observation

  • Add media

  • Are step ladders being used for the appropriate work tasks being carried out (i.e. electrical work)

  • Observation

  • Add media

  • Are all access points clear and unobstructed

  • Observation

  • Add media

  • Is the area around the ladder clear of all fall hazards

  • Observation

  • Add media

  • Has there been a documented ladder inspection checklist during the last 30 days

  • Observation

  • Add media

Formwork (Reg 3.48/3.57)

  • Is there a risk of fall from height

  • Observation

  • Add media

  • Written procedures developed and followed for working at heights (JSA)

  • Observation

  • Add media

  • Permit system for working at heights

  • Observation

  • Add media

  • If stay harnesses are in use, do they and the anchor points comply with relevant Australian Standards

  • Observation

  • Add media

  • Personnel trained in use of PPE e.g. safety harness if required

  • Observation

  • Add media

  • PPE inspected and maintained and fall restraint register established

  • Observation

  • Add media

  • Safe access/egress provided to all work places

  • Observation

  • Add media

  • Objects removed from fall zones

  • Observation

  • Add media

  • Edge protection as required

  • Observation

  • Add media

  • Catch platforms provided to prevent persons from falling from a height

  • Observation

  • Add media

  • Formwork progressing in a systematic manner

  • Observation

  • Add media

  • Formwork checked by a competent person

  • Observation

  • Add media

  • Barriers erected in work areas

  • Observation

  • Add media

  • Warning signs erected to prevent persons walking into fall zones

  • Observation

  • Add media

  • Ladder/stair access provided

  • Observation

  • Add media

  • Fall zones barricaded off

  • Observation

  • Add media

  • Penetrations meshed, covered with warning signs

  • Observation

  • Add media

Tilt Panel and Pre-cast Concrete (Reg 3.88)

  • Personnel i.e. riggers/crane operators are trained

  • Observation

  • Add media

  • Crane operations i.e. setup, power lines, slings, etc.

  • Observation

  • Add media

  • Documentation i.e. logbooks, JSAs, etc.

  • Observation

  • Add media

  • Shop drawings i.e. drawings signed by certified engineer

  • Observation

  • Add media

  • Australian Standards 3850-2003 and Code of Practice for Tiltup and Precast Concrete available onsite

  • Observation

  • Add media


  • http://www.commerce.wa.gov.au/WorkSafe/PDF/Codes_of_Practice/Code_Tiltup_Precast_.pdf

  • Safe erection process i.e. fall zones, panels and bracing

  • Observation

  • Add media

  • Braces i.e. locked 2 per panel

  • Observation

  • Add media

  • EWP used rather than ladders

  • Observation

  • Add media

  • Safe storage onsite for panels i.e. not leant against temp brace panel

  • Observation

  • Add media

  • All personnel including supervisors have been trained in accordance to an accredited Tiltup and precast concrete course

  • Observation

  • Add media

  • All untrained personnel requiring access to tilt panel areas been given authorisation to do so by relevant personnel (use of form F8.83)

  • Observation

  • Add media

  • Safety signage and barricades erected

  • Observation

  • Add media

Health Hazards

  • Is noise monitored in the workplace to determine the requirement for PPE

  • Observation

  • Add media

  • Are there any work activities that require personal exposure monitoring/health surveillance

  • Observation

  • Add media

  • Are personnel protected from exposure to excessive vibration

  • Observation

  • Add media

  • Is ventilation, lighting and temperature in confined spaces and site offices monitored and controlled to ensure the health and safety of personnel

  • Observation

  • Add media

Environmental/Green Star

  • Is there an environmental plan for the site

  • Observation

  • Add media

  • Has the environmental plan been signed by the project manager

  • Observation

  • Add media

  • Is there a complete spill kit available on site

  • Observation

  • Add media

  • Is the site maintained in a clean and tidy state to minimise the occurrence of environmental incidents

  • Observation

  • Add media

  • Are drains inside the site free from building materials

  • Observation

  • Add media

  • Is dust generated by vehicle movement minimised using appropriate road base or the application of water?

  • Observation

  • Add media

  • Is dust generated by the cutting of concrete, bricks, tiles, etc minimised using wet cutting where applicable, vacuum or dustless cutters?

  • Observation

  • Add media

  • Are emissions produced from fixed or mobile plant minimised in accordance with the relevant code?

  • Observation

  • Add media

  • Are gutters outside the project free of building materials

  • Observation

  • Add media

  • Are the gutter drains protected by enviro socks or other means

  • Observation

  • Add media

  • Are the sedimentation fences in place and being maintained around the site

  • Observation

  • Add media

  • Have the bricklayers a system to prevent waste when using their equipment e.g. Brick saw or mixer

  • Observation

  • Add media

  • Does the painter have a system in place for disposal of excess paint

  • Observation

  • Add media

  • Are waterways (sewers, storm water drains, etc) and soil protected from contamination by the discharge of any polluting substances i.e. the washing down of plant and equipment and concrete trucks

  • Observation

  • Add media

  • Are chemicals stored and used responsibly, and chemical wastes disposed of according to best industry practice

  • Observation

  • Add media

  • Is noise minimised to comply with the local authority requirements and specific client requirements e.g. Restricted working hours

  • Observation

  • Add media

  • Is equipment that causes excessive vibration assessed and selected to minimise any structural damage to the project or surrounding buildings

  • Observation

  • Add media

  • Are materials used in an economical manner

  • Observation

  • Add media

  • Are all recyclable materials segregated and stored appropriately for reuse or off site recycling

  • Observation

  • Add media

  • Are all water supplies turned off when not in use

  • Observation

  • Add media

  • Is all electrical equipment turned off when not in use

  • Observation

  • Add media

  • Have the weekly inspection sheets been completed and actioned

  • Observation

  • Add media

  • Has there been a quarterly environmental inspection done and documented

  • Observation

  • Add media

  • Has there been any training in the environmental plan

  • Observation

  • Add media

  • Are the dewatering pits in good condition and is fencing adequate

  • Observation

  • Add media

Quality

  • RFI register in place and up to date

  • Observation

  • Add media

  • RFI hard copy on site with answers

  • Observation

  • Add media

  • Drawing register in place and up to date

  • Observation

  • Add media

  • Do drawings match register

  • Observation

  • Add media

  • Permit system in place and is register up to date

  • Observation

  • Add media

  • Meeting minutes maintained on site

  • Observation

  • Add media

  • Building licence on site and displayed

  • Observation

  • Add media

  • ITPs established and maintained (i.e. pre-pour checklists, etc)

  • Observation

  • Add media

  • Product Registers in place and maintained (i.e. concrete register, etc)

  • Observation

  • Add media

  • Are there any Monitoring or Measuring devices on site.

  • Is there a site calibration register and are there copies of the certificates maintained on site.

  • Add media

Corrective Actions

  • High Risk: Does the hazard have the potential to kill or permanently disable you? - Action immediately
    Medium Risk: Does the hazard have the potential to cause a serious injury which will temporarily disable you? - Action within 24 hours
    Low Risk: Does the hazard have the potential to cause a minor injury which would not disable you? - Action within 7 days

  • Corrective Actions/Recommendations Report

  • Corrective Action
  • Corrective Action description

  • Add media

  • Risk Level

  • Action by who?

  • Action complete

  • Action complete sign off

  • Action complete date

  • Opportunity for Improvement

  • OFI
  • OFI description

  • Add media

  • Notes/comments

  • This site safety inspection report is advisory and is for the use of the party to whom it is addressed and for no other purpose. No responsibility is accepted or undertaken to any third party who may use or rely on the content of this report. No responsibility is accepted or undertaken for any decisions made by the addressee in relation to sit e safety, whether made on the basis of this report or otherwise.

Additional Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.