General
-
Is there an approved Project Management Plan and has it been signed by the relevant parties?
-
Add media
-
Have all site personnel completed the NGA online induction and the Sign on Site induction prior to commencing work on site?
-
Add media
-
Is the site fencing or hoarding in good condition and have all hazards been properly barricaded or fenced?
-
Add media
-
Have overhead hazards been identified or isolated?
-
Add media
-
Are correct advisory signs displayed on site entries? (Construction Signs, PPE Signs, Visitor advisory signs, Plant Movement signs, Laser and EPT Signs).
-
Add media
-
Are the necessary fire and evacuation procedures in place and appropriate assembly and muster points identified?
-
Add media
-
Are relevant services search documents available on site? (DBYD, Scanning Reports).
-
Add media
-
Are the Risk Register and Project Risk Assessment on site? Have they been signed off by the Supervisor and the Project Manager? Has the Project Risk Assessment been reviewed within the last thirty days and start/finish dates been noted?
-
Add media
-
Has each contractor submitted their SWMS or JSA's and have they been signed off for site acceptance by the Site Supervisor?
-
Add media
-
Are tool box meetings conducted and if so when and what topics have been covered within the last thirty days?
-
Add media
-
Are all registers up to date? (Electrical, Lifting Gear, Fall Arrest, Calibration).
-
Add media
-
Is the daily diary/stats sheet up to date?
-
Add media
Office Area and Amenities
-
Is there easy access to the first air kit(s)?
-
Add media
-
Are the contents clean, orderly stocked and labelled?
-
Add media
-
Have the site first aiders been identified and their contact details displayed?
-
Add media
-
Are fire extinguishers readily available and fit for use and tagged within the last six months?
-
Add media
-
Are all toilets, amenities, office and rest rooms on site clean and tidy and are they adequate supplies of water and hand washing facilities?
-
Add media
-
Are the fridge and microwave clean and are the bins not overflowing?
-
Add media
-
Is the information on the notice boards current?
-
Add media
-
Are all six Northerly Group policies displayed in the office and the crib room?
-
Add media
-
Are all three basic emergency procedures displayed in both the office and the crib room?
-
Add media
-
Are subcontractors office areas and storage areas clean and tidy?
-
Add media
Work Areas
-
Are work areas clear of rubbish?
-
Add media
-
Are walkways level, clear of rubbish or obstructions, and are emergency routes all clear of obstructions?
-
Add media
-
Are all holes covered and marked "Danger Hole Below", or penetrations fenced or edge protection in place?
-
Add media
-
Is there adequate lighting in work areas and are stairwells illuminated?
-
Add media
-
Are fire extinguishers strategically located around the site, easily identifiable, readily accessible and tagged within the last six months?
-
Add media
-
Are fire extinguishers available near hot works?
-
Add media
-
Is electrical equipment tagged and tags current?
-
Add media
-
Are electrical leads hung overhead by lead stands or insulated hooks and are they clear of traffic or persons?
-
Add media
-
Are workers wearing the mandatory PPE, (Hard Hat, Steel Capped Safety Footwear, Hi-Viz shirt or vest NO SINGLETS OR TANK TOPS), and is task specific PPE being used? (Safety Glasses, Gloves, Hearing Protection).
-
Add media
-
Are the tools used by workers in good condition and all required safety guards are in place?
-
Add media
Hot Works
-
Have the subcontractors carried out a risk assessment for the hot works they are carrying?
-
Add media
-
Is there a current Hot Works Permit in place?
-
Add media
-
Is the Oxy/Acetylene equipment used in good condition, (Gauges, etc) or if a welder is it tagged for the current period?
-
Add media
-
Can you verify that oxy/acetylene bottles are fitted with flash back arrestors and the wand end also has flash back arrestors?
-
Add media
-
Is the housekeeping in the hot work areas good and is there signage and barricades or screens in place?
-
Add media
Scaffold and Ladders
-
Are all scaffolds >4 metres Scaff-Tagged, tag is legible and within the last thirty days, and Handover Certificates or Checklists are in place?
-
Add media
-
Edge protection or mesh guards in place for all fixed scaffolds over 2 metres?
-
Add media
-
Edge protection with top rail, mid-rail, kick boards, and internal ladder on all mobile scaffolds above 2 metres?
-
Add media
-
Are access ladders appropriate and secured at the top and the bottom, are they angled correctly with a 4in1 ratio, and do they extend a minimum of 1 metre past exit point?
-
Add media
-
Are all step ladders auto locking and/or platform ladders?
-
Add media
Mobile Plant and Elevated Work Platforms
-
Are relevant records available for plant being operated on site? ( Plant Mobilisation and Risk Assessment and Pre-Starts).
-
Add media
-
Are SWL's, capacities and tolerances etc known for relevant equipment, displayed and complied with?
-
Add media
-
Is the EWP log book available and completed?
-
Add media
-
Is the EWP operator trained and has a current high risk license if operating a boom type EWP.
-
Add media
Environmental
-
Is there a spill kit on site and are the contents adequate for the site requirements?
-
Add media
-
Are noise control measures in place and are workers protected against working in a noisy environment?
-
Add media
-
Are dust controls in place and if so what are they?
-
Add media
-
Are Northerly Group HAZCHEM processes being followed with contractors supplying a HAZCHEM Register, SDS, Risk Assessments for classified substances and are the Risk Assessments attached to the SWMS or JSA?
-
Add media
-
Are Hazardous Substances stored and used as per the SDS?
-
Add media
-
What if any recycling measures are in place and are recyclable materials segregated and stored appropriately for reuse or off site recycling?
-
Add media
-
Has there been a quarterly environmental inspection done and if so when was the last one done?
-
Add media
-
If relevant are Green Star deliverables being met and documented?
-
Add media
-
Are there any Heritage issues and if so are they being addressed and is compliance being met?
-