Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Representative
Electrical
-
Has SSL equipment been tested and tagged each month?
-
Has a copy of Test register been kept by SSL Leading Hand?
-
Are lead stands or Hooks in use?
-
Is electrical equipment in good condition free from damage?
Environmental
-
Does the site have Environmental controls in place for Washout?
-
Is steel recycled by SSL on site?
-
Where is grout washed out and disposed of?
-
Is the site clear of SSL general waste such as cement bags, chair bags etc
-
Have SSL had any environmental breaches?
Grouting
-
Is the grout pump clean and fitted with safety guard and test & tag label?
-
Has a site test been conducted on the Grout Mix, if so what were results?
-
Are grout tubes full and upright?
-
Has grout QA been completed correctly?
Incidents and First Aid
-
Have any incidents been recorder / reported?
-
How were these closed out?
-
Do the site personnel know where the emergency assembly point area is?
Quality Assurance
-
Have strand numbers been recorded in QA book?
-
Have coil tags been kept and do they correspond with QA book?
-
Have any NCR been recorded against SSL?
-
Have any NCR been raised by SSL for this project?
-
Is QA book signed by client?
-
Is QA book up to current works?
-
What level is being worked on currently?
-
Does drawing register match current drawings
-
Is this a D&C project, who is the designer if its not a D&C project?
Safe Work Method Statements
-
Have SWMS been signed and dated by all site employees
-
What revision is the SWMS?
-
Does it have the correct Leading hand?
-
Doe star SWMS refer to the correct state legislation?
-
Has a toolbox talk been conducted reviewing the SWMS?
Site Inspection
-
Are all site employees wearing SSL issued uniform?
-
Are all site employes wearing correct PPE for task (Gloves, Glasses, Safety footwear, hard hat, long pants, long sleeve shirt)
-
Does coil have flagging in place to prevent whip injuries?
Site QSE folder check
-
Has the Pre start meeting forms been completed correctly
-
Have all site employees signed the form?
-
Has the site PPE Register been signed off by all?
-
Has the induction register been signed off?
Lifting Devices
Stressing Equipment
-
What is the Stressing Jack number and gauge number?
-
Is the calibration certificate current, Note down test date and when retest is due
-
Does jack number reflect QA documentation