Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Representative

Electrical

  • Has SSL equipment been tested and tagged each month?

  • Has a copy of Test register been kept by SSL Leading Hand?

  • Are lead stands or Hooks in use?

  • Is electrical equipment in good condition free from damage?

Environmental

  • Does the site have Environmental controls in place for Washout?

  • Is steel recycled by SSL on site?

  • Where is grout washed out and disposed of?

  • Is the site clear of SSL general waste such as cement bags, chair bags etc

  • Have SSL had any environmental breaches?

Grouting

  • Is the grout pump clean and fitted with safety guard and test & tag label?

  • Has a site test been conducted on the Grout Mix, if so what were results?

  • Are grout tubes full and upright?

  • Has grout QA been completed correctly?

Incidents and First Aid

  • Have any incidents been recorder / reported?

  • How were these closed out?

  • Do the site personnel know where the emergency assembly point area is?

Quality Assurance

  • Have strand numbers been recorded in QA book?

  • Have coil tags been kept and do they correspond with QA book?

  • Have any NCR been recorded against SSL?

  • Have any NCR been raised by SSL for this project?

  • Is QA book signed by client?

  • Is QA book up to current works?

  • What level is being worked on currently?

  • Does drawing register match current drawings

  • Is this a D&C project, who is the designer if its not a D&C project?

Safe Work Method Statements

  • Have SWMS been signed and dated by all site employees

  • What revision is the SWMS?

  • Does it have the correct Leading hand?

  • Doe star SWMS refer to the correct state legislation?

  • Has a toolbox talk been conducted reviewing the SWMS?

Site Inspection

  • Are all site employees wearing SSL issued uniform?

  • Are all site employes wearing correct PPE for task (Gloves, Glasses, Safety footwear, hard hat, long pants, long sleeve shirt)

  • Does coil have flagging in place to prevent whip injuries?

Site QSE folder check

  • Has the Pre start meeting forms been completed correctly

  • Have all site employees signed the form?

  • Has the site PPE Register been signed off by all?

  • Has the induction register been signed off?

Lifting Devices

Stressing Equipment

  • What is the Stressing Jack number and gauge number?

  • Is the calibration certificate current, Note down test date and when retest is due

  • Does jack number reflect QA documentation

Summary Report and Actions

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.