Title Page
-
Prepared by
-
Conducted on
-
Location
-
Client:
-
Job number:
-
Site conducted
Verification of Installation Procedures:
Select the type(s) of products you are inspecting:
-
General Prodcuts
-
Stair-nosing
-
Metal Work
-
Handrails
-
Car Park Safety
-
Tactiles
-
Entrance Matting
Verification of Installation Procedures:
-
Is the product properly installed according to Nova's instructions?
-
How would you rate the overall quality of the installation?
-
How many units of the product were installed?
-
Were all safety measures followed during the installation?
-
When was the installation completed?
-
Can you provide a picture showing the final installation setup?
-
Are the products inspected compliant with Australian Standards?
Documentation and Reporting:
-
Is it ready to send a warranty certificate?
-
Name of the Nova inspector/Auditor:
-
Signature of the Nova inspector/Auditor:
-
Name of the client representative (i.e: site supervisor, site engineer, project manager, CA)
-
Signature of the client representative (i.e: site supervisor, site engineer, project manager, CA)
-
Date of inspection