Title Page
-
undefined
-
Site Name/Contract No.
-
Manual Site input
-
Location
-
Date and Time Starting on site
-
Prepared by
Daily Observations
-
Are you using a hard copy Diary? Provide a photo record of entry.
-
Provide a Detailed Observation of the works being undertaken and their Chainages.
-
Add photos of work being conducted.
Forecast Temperature
-
Weather Conditions
- Fine
- Overcast
- Overnight Rain
- Raining
- Possible Shower
- Windy
- Total Fire Ban
- Hot Conditions
-
Provide a description if inclement conditions effected the works Program.
-
Record of overnight and daily rainfall.(mm)
Site Records
-
Personnel on site
- No Personnel On-site
- Surveillance Manager
- Project Manager/Engineer
- Construction Supervisor
- Leading Hand
- Road Workers
- Plant Operator
- Truck Driver
- Drainage Crew
- Traffic Controller
- TMA Driver
- Barrier Crew
- Concreting Crew
- Sub Contractors Onsite
- Service Locator
- NDD Crew
- Tree Trimming Crew
- Stabilising Crew
- Sealing Crew
- Asphalting Crew
- Geotech
- Surveyor
- Line marking Crew
- Line Marking Crew
- Saw Cutter
- DDH Drilling Crew
- Temporary Barrier Crew
-
If there are more than 1 of each please provide details and total number of Personnel on-site or a photo of the sign in register.
-
Plant on site
- No Plant On-Site
- TMA
- Traffic Ute
- Pod Truck
- Excavator
- Tipper
- Grader
- Watercart
- Pad Foot Roller
- Smooth Drum Roller
- Multi Wheel Roller
- Backhoe
- SkidSteer
- Paver
- Profiler
- Sweeper
- Spray Seal Truck
- Spreader Truck
- Post Rammer
- EWP
- Stabilise Mixer
- Stabilizer Tanker
- Crane/Franna
- NDD Truck
- DDH Driller/ Core Drill
- Wood Chipper
- Flocon
-
Are there any Issues or Risks with the works being undertaken?
-
Provide details the Issue or Risk
-
Contractors Representative Signature
-
Have Any Incidents Or Near Misses Occured
-
Have you completed an Incident Report on the SafeT system?
-
Incident No.
Pavement Observations
Pavement Layers
-
Pavement Layer Observed
- Sub Grade
- Type A
- Class 3
- Class 2
- Class 1
- Cement Treated Crushed Rock
- Final inspection for Seal
-
Is the presented surface ready for seal or asphalt
-
Provide Details of ball penetration test and photos of presented surface
-
Contractors Representative Signature
-
Detail the failure
-
Contractors Representative Signature
-
Have Any Proof Rolls Been Conducted?
-
Provide notes of observations include chainages.
-
Has the Proof Roll passed?
-
Details of NCR.
-
Contractors Representatives Signature.
-
Contractors Representatives Signature.
Material Records
- MATERIALS DELIVERED
-
Material Type
- Type A
- Type B
- Class 1
- Class 2
- Class 3
- Class 4
- Asphalt
- CTR
- Concrete
- Bitumen and Seal Material
-
Concrete Testing Results.
-
Details of test failure.
-
Estimated Daily Quantity (cubic meters)
-
Is Surface free from loose material?
-
Detail dry back moisture.
-
Provide Details
-
Results of Ball penetration Test
-
Provide Details
-
Primer/Bitumen Temperature
-
Surface Temperature
-
Provide Chainages of todays works
-
Are forward moving Spreaders being used?
-
Stop works and notify the contractor of the Issue.
-
Provide photos of works.
-
Material Unit
-
Estimated Daily Quantity
-
Estimated Daily Quantity
-
Material Unit
-
Estimated Daily Quantity
-
Estimated Daily Quantity
-
Estimated Daily Quantity (tonnes)
-
Estimated Daily Quantity (tonnes)
-
Estimated Daily Quantity (tonnes)
-
Estimated Daily Quantity (tonnes)
-
Estimated Daily Quantity (tonnes)
-
Estimated Daily Quantity (tonnes)
-
Provide Photo of delivery Docket
Environmental Controls
-
Are Environmental controls as per EMP/CHMP?
-
Is there a need to complete an Environment and Cultural Heritage Audit
-
Detail the actions taken.
-
Attach photos of Environmental of Cultural Controls.
Variations
-
Have Any Variations Been Agreed To?
-
Details of the Variation.
-
Contractors Representative Signature
Comments Regarding Days Works
-
Are there any Day works agree to?
-
Add any comments in regards to day-works being undertaken and add photos include receipt of dayworks record
-
Contractors Representative Signature.
Site Conversations
-
Are There Any Other Items That are Not Previously Mentioned That Need Recording?<br>If So Please List Below (IE: Conversations, Observations etc)
-
Details of conversation.
-
Is there an action Required?
-
Receivers Signature
Record Keeping
-
Have any ITP'S been signed off?
-
ITP document no.
-
Add photos and/or notes
-
Have Any Works Memos Been Given?
-
Works Memo Number.
Traffic Management
-
Has the MOA been sighted and has it been Activated?
-
Stop works and inform the Project manager and Contractor
-
Is the Traffic setup as per the TGS
-
Are the changes documented?
-
Detail the instructions issued in regards to Traffic Management
-
Provide photo of documented changes.
-
Provide photos and/or notes on the observed setup.
Time Started Onsite/ Time Finished Onsite
-
Time Finished Onsite