Title Page

  • Conducted on

  • Prepared by

  • Location

Offsite

  • Site Address

  • Ref Number

  • Work Activity

  • Team Leader

  • Other Members

Safety of personnel

  • Is method statements in ‘Black Books’ available and in date

  • Does activity comply with method statement

  • Has pre work risk assessment been carried out

  • Up to date colour utility plans available

  • Proban treated clothing available and worn where appropriate

  • Safety helmets

  • Ear defenders

  • Safety goggles/ Safety Spectacles

  • Gloves

  • Comprehensive first aid kit readily available/ Eyewash available

  • Breathing apparatus x 2 available

  • Is it stored and/or in good condition ( not contaminated)

  • Is the face mask in date and fit for purpose

  • Does the BA box contain two fire resistant balaclavas

  • Has the team completed the monthly BA inspection form

  • Has the form been countersigned by a supervisor/agent

  • Safety boots

  • High visibility clothing

  • Has the team reported any near misses

  • Discuss the near miss with the team

Tools and Equipment

  • Gascoseeker

  • ElectroFusionBox

  • Butt fusion equipment

  • Continuity bonds

  • Extension lead (110v)

  • Tent – (to cover fusionbutt fusion equipment)

  • Leak detection fluid

  • Cable and pipe locator

  • Pressure test gauges

  • LP Bull Horns available and in date

  • MP Bull Horns available and in date: see 11a below

  • On Site teams will only carry the above for specific MP work

  • 2 x Fire extinguishers available and in Date

  • Hand tools issued to teams available/ in good condition/ fit for purpose

  • Lifting equipment, lifting slings, shackles etc in good condition and within inspection date

  • Voltstick available works and correctly used

  • Excavator/Dumper Seat Belt worn/ cab or roll over cage. Movement around site managed, including spoil storage area? Machine adequately secured to trailer when towing?

  • Small Air Drill, appropriate drill bit, Rivet Gun & rivets

Environmental

  • Evidence of waste segregation and management on site

  • Spill kits available for use

  • Fuel/Oil containing vessels stored & managed to avoid contamination (e.g: Drip Tray, Bung, plant nappy)

  • Equipment, Spoil & fuel stored to avoid contamination of drains & water courses

  • Risks to ecology or from invasive plants managed on site (E.g: Knott Weed, Wildlife)

  • Risks from contaminated land assesed & controlled on site (E.g: Coal Tar)

NRSWA

  • NRSWA complies with NRSWA guidance

  • Barriers/HERAs fencing and signs in good condition

  • Barriers and signs adequately secured and weighted

  • Adequate controls to protect pedestrians including vulnerable people are in place and to ensure safe passage around our site

  • Vehicles/Plant/Materials stored within a barrier system

  • All excavations, including within the private adequately protected/covered

  • Footway Boards and Plates used safely, reducing risk of STF hazards or risk of movement. Are boards/plates in good condition and to specification

  • Is there a high standard of housekeeping on site and the risk of STF hazards ie cables/hoses etc are managed

Underground & Overhead Utilities

  • Evidence of marking up, including outside of excavation and along face of excavation

  • CAT & Genny out with evidence of use

  • CAT & Genny and all attachments in date and in good condition

  • Good understanding of the location of utilities that corresponds with utility plans and visual indicators

  • Evidence of Safe Digging practices being adopted

  • Clear assessment of risks been undertaken before mechanical plant is used

  • Have overhead cables risks been identified/controlled (use of Diggers/HIAB's) Is spoil and materials stored under/away from OHLs?

  • Exposed utilities protected/supported as required

Excavations

  • Risk from dusty activities fully managed. Water Suppression plus full PPE including dust mask is used when saw cutting. Dust supression effective

  • Is excavation size suitable for the activity

  • Is there suitable means of access/egress for the size/depth of the excavation

  • Is there evidence that the team have assessed the stability of the excavation, having regard to external factors ie walls, lampposts etc. Has the risk of the excavation being a confined space been considered?

  • Is spoil/materials stored a safe distance away from the edge of the excavation

  • Is plant/vehicles inc grab/vac ex stored a safe distance away from the edge of the excavation

  • Are tools/materials stored a safe distance or securely to prevent them falling or being kicked into the excavation

Jointing

  • Pipe/Fittings stored correctly and clean. Joint protected from weather as required

  • Clamps used and pipe cut/scrapped correctly. Joints/Fittings marked

  • Fusion cycled completed correctly. Joint/Fittings inspected following fusion and soap test completed

  • Correct separation distances between fittings/squeeze off etc

  • Is butt fusion controls ie dummy welds, inspection of beads etc being followed

Backfill and reinstatement

  • Is an approved finefill material used

  • Are HAUC specifications being met

Mains

  • Bands cut in sequence and pipe restrained. Correct number of people on site

  • Pipe assessed for damage prior to insert/lay

  • If mechanical plant is used to lift or transport materials/equipment, are operatives competent, is the plant suitable and certificated as required

Transport Compliance

  • Is vehicle, trailer, plant underweight and loaded correctly

  • Any damage found e.g., lights, mirrors, bodywork

  • Are tyres within legal limit

  • Is tow hitch assembly fit for purpose

  • Is daily defect check being carried out and compliant

  • Is tachograph process in place as per company policy

  • Is vehicle servicing in date

  • Is the 12 weekly plant inspection process in date

  • Is the vehicle fitted with a bunded flammables box

  • Are the lorry steps/ ladders in good condition

Qualifications

  • ID CARD – TEAM LEADER

  • ID CARD – SECOND TEAM MEMBER

  • ID CARD – THIRD TEAM MEMBER

  • Qualifications adequate for work being done team leader

  • Qualifications adequate second team member

  • Qualifications adequate third team member

  • Team Leader Signature confirming findings and accepting recommended actions:

  • Auditor Signature confirming that this report is a true reflection of findings on site:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.