Title Page
-
Site
-
Employee
-
Trade
-
Organisation
-
Contractor
-
Ops Names
-
Conducted on
-
Prepared by
-
INSTRUCTIONS:
-------------------------------------
1. Answer the applicable questions.
2. Click Add photos and notes.
3. To add a Corrective Measure click on "Add Action", provide a description, assign to a member, set priority and due date.
4. Complete audit by providing digital signature.
5. Share your report by exporting as PDF, Word, Excel or Web Link. -
FORM KEY:
RA — Risk Assessment
MS — Method Statement
MSDS — Material Safety Data Sheet
PTW — Permit To Work
PPE — Personnel Protection Equipment
WE — Work Equipment
S&S — Suitable & Sufficient
RPE — Respiritable Protection Equipment
MEWP — Mobile Elevated Work Equipment
STF — Slip Trip Fall
PAT — Portable Appliance Test
RCD — Residual Current Device
COD — Out Of Date
WELFARE
-
1.1 Signs / Policy Documents
-
1.2 1st aid facilities adequate
-
1.3 Security of Scion facilities
-
1.4 PAT of welfare facilities
-
1.5 FRA arrangements S&S
-
1.6 Electric Periodic Inspection
-
1.7 Welfare facilities clean
OPERATIVES - Scion Estates
-
2.1 Induction
-
2.2 Qualified for task
-
2.3 Uniform / ID
-
2.4 Training / Handbook
-
2.5 Attitude of Op
DOCUMENTATION
-
3.1 RA / MS in site pack
-
3.2 RA / MS masters signed
-
3.3 Op abiding by SSW
COSHH
-
4.1 Coshh Ass in site pack
-
4.2 MSDS available
-
4.3 Suitable containers
-
4.4 Correct use I PPE
-
4.5 Adequate ventilation
-
4.6 Spillage kits available
COMPOUND / YARD / WORKSHOPS
-
5.1 Racking / Storage correct
-
5.2 Fuel Bunded / locked
-
5.3 Spillage kit available
-
5.4 Lighting
-
5.5 LOLER
-
5.6 Workbenches / W.E. S&S
-
5.7 Any Walkways / STF Haz's
VEHICLE
-
6.1 Safe parking
-
6.2 Smokin sign / evidence
-
6.3 Vehicle checks / FE / WCL
-
6.4 Contents / Store (Haz mat)
AREA OF OPERATION - Mobile Sites
-
7.1 Any STF Hazards for Pub I Ops
-
7.2 Public Hazards (Segregation)
-
7.3 Housekeeping
-
7.4 Storage of WE / Material
-
7.5 Fire haz ignition / fuel source
-
7.6 Noise / Haves data noted
-
7.7 Traffic doesn't encroach on task
-
7.8 Weather does not restrict task
WORK EQUIPMENT - Including Plant
-
8.1 Work equip S&S / good cond
-
8.2 Guards fitted to Plant
-
8.3 Plant disabled when not in use
-
8.4 Serviced / Pre use insect / Tax
PPE - Worn correctly / Condition / Available
-
9.1 Footwear
-
9.2 Gloves
-
9.3 RPE
-
9.4 Goggles
-
9.5 Ear protection
-
9.6 Hi visibility clothing
-
9.7 Head protection
WORKING AT HEIGHT
-
10.1 Ladders S&S / type
-
10.2 Ladder tags in date
-
10.3 Safe use of WAH equipment
-
10.4 MEWP safe use
-
10.5 Mobile Tower planned correctly
WASTE
-
11.1 Waste stored in adequate area
-
11.2 Is waste segregated
-
11.3 Is waste disposed of correct
PLANNING
-
12.1 Fencing task planned
-
12.2 Tree Felling task planned
-
12.3 Excavation task planned
-
12.4 Snow & Ice Clearance planned
-
12.5 Razor Wire handled correctly
COMPLETION
-
Notes
-
From the activities witnessed inspectors are to list the RA / CA / MS that would be applicable to this area:
A site observation of the workers could not take place because upon arrival the workers had completed their task for the day, they was issued a total of ten tonnes of tarmac for the day due to the cold and weather conditions and the workers informed me that both Rhodes and OMBC had been notified that this was the case. Upon arrival of the site it was noticed that the main warning signs had blown over and required repositioning, the workers was notified of this and asked to re-secure them. -
Inspector's Name and Signature
-
Manager's Name and Signature