Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Location
  • Audited by

  • Project

  • Unit Number

  • Floor Level

  • Go to next section

Categories

  • Select a Category you wish to Audit

Penetrations

  • Is setout correct

  • Penetrations installed / cored

  • Select date

  • Add signature

Stack Work

  • Setout correct

  • Stack work

  • Stack work supported correctly

  • Stack work tested for leaks

  • Test plugs been removed from inspection openings

  • Inspection openings accessible (all glued)

  • Are air admittance valves installed and accessible

  • Tundish installed in agreed location

  • Penetrations sealed, fire rated and noted on schedule

  • Acoustic lagging installed

  • Stack work labelled

  • Stackwork inspected

  • Select date

  • Add signature

Down-Pipes / Balcony Outlets

  • Set out correct

  • Pipe work grades correct

  • Pipework supported correctly

  • Pipework tested for leaks (applicable if cast in slab)

  • Acoustic lagging installed

  • Penetrations see you, fire rated and noted on schedule

  • Select date

  • Add signature

Risers - Water Services and Gas Services

  • Set out correct

  • Pipe work supported correctly

  • Pipe work capped off for testing

  • Valves and meters installed and accessible

  • Pipework installed and tested to manufactures recommendations

  • What Was the Kpa

  • Penetrations sealed, fire rated and noted on schedule

  • Pipe work inspected

  • Select date

  • Add signature

Rough - In - Water Services and Gas Services

  • Set out correct

  • Pipework supported correctly

  • Pipework through stud work siliconed

  • Pipework checked for any cross overs

  • PEX joints checked open (visual)

  • Noggins installed for fit-off / not bowing at all

  • Pipework capped off for testing

  • Pipe work installed and tested to manufacturers recommendations

  • What is the Kpa

  • Penetrations sealed, fire rated and noted on schedule

  • Bath installed connected and protected

  • Pipe work inspected

  • Select date

  • Add signature

As Built Drawings and Documentation

  • As-built drawing complete

  • Fire rating schedule complete

  • Select date

  • Add signature

Fit Off

  • All valves fully on

  • All fixtures fitted off as per manufacturers instructions

  • All siliconing complete

  • Are all floor wastes/shower waste clean

  • Are all tap aerators clean from debris and not leaking

  • Water level in cistern set at right level

  • Write down Hot water delivery Temperature in degrees Celsius

  • Have all basin/sink traps been checked for leaks

  • Have all shower/bath spindles and shower Rose/bath outlet been silicon – sealed behind cover plate

  • Select date

  • Add signature

Final Inpection

  • Final plumbing inspection been carried out

  • Select date

  • Add signature

Handover

  • Unit variations complete

  • You need clean and free from rubbish

  • All defects and outstanding items complete

  • Final visual check

  • Select date

  • Add signature

  • If completed then goto next section

Sign Off

  • Sign off to be initialled and signed by

  • Select date

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.