Title Page
-
Site conducted
-
Name
-
Conducted on
-
Prepared by
Preliminaries
-
Name:
-
Company/ Branch:
-
Line Manager /Supervisor:
-
Direct Employee/ Agency:
-
Site Address:
-
Asbestos material:
-
LW/NNLW/NL:
-
Task to be undertaken “at time of assessment”
-
Site Set Up
-
Enclosure construction
-
Removal
-
Fine Clean
-
Waste Removal
-
Air Monitoring
-
Detent
1.0 RPE + PPE
-
(1= Poor, 2=Improvement Needed, 3=Good, 4=Excellent
-
1.1 Check RPE (Inspection, storage, cleaning, reporting)
-
1.2 Correctly wearing appropriate PPE
2.0 Site Set Up:
-
2.1 Signage/Understanding of POW
-
2.2 Positioning of DCU, erection of enclosure/air/bag
-
2.3 Positioning of signage, CCTV, Viewing Panels, Emergency Exit
3.0 Decontamination Procedures:
-
3.1 Correct entry and exit to/from DCU and through airlock
4.0 Strip Techniques – Correct procedures for:
-
4.1 Mist Spraying
-
4.2 Shadow Vacuuming
-
4.3 Multi Point Injection
-
4.4 Wrap and Cut/Glove Bag
-
4.5 Quill Falcon/water jetting
-
4.6 General Use of Equipment
5.0 Waste Procedures:
-
5.1 Bagging of Waste
-
5.2 Bag lock Procedures
-
5.3 Placing of Waste into Receptacles
6.0 Final Clean:
-
6.1 Vacs, Airlock – Enclosure
-
6.2 Use of Tools and Consumables
-
6.3 Fine Clean
7.0 Decontamination Procedures:
-
7.1 Plant and equipment
8.0 General:
-
8.1 Housekeeping
-
8.2 Appearance
-
8.3 Attitude
-
8.4 Behavior
-
8.5 Punctuality
-
8.6 Personal Certification
-
8.7 H&S - Hazard Perception etc