PAINT SHOP SAFETY AUDIT

A. Electrical

  • 1. Are the lighting circuits properly wired and do they have adequate<br>fuses and circuit breakers?

  • 2. Is all permanent wiring in approved conduit and free of "juryrigging" such as extension cords in place of proper electrical cabling?

  • 3. Does the supervisor enforce a "Lockout/Tagout" policy for electrical<br>machinery repair?

  • 4. Is all electrical equipment effectively grounded IAW NFPA 70<br>(National Electrical Code)?

  • 5. Does all electrical equipment within the painting area meet the<br>NFPA 70, Section 500 requirements for "explosion proof"<br>installations.?

B. Chemical

1. Toxics

  • a. Is all paint spraying done either outside or in a paint spray<br>booth designed in accordance with Section 1.3 of this Guide?

  • b. Are the workers knowledgeable about Time Weighted Average<br>(TWA) concepts regarding hazardous chemicals, such as those<br>listed in Table 1.1.1.

  • c. Are NIOSH/MSHA approved respirators used by the<br>employees working inside with solvent based paints or solvent<br>materials?

  • d. If so, has Post implemented the required respirator program<br>specified in Section 1.4 of this Guide?

  • e. Do respirators contain both an organic and particulate filter.

  • f. Do employees use solvent resistant gloves when working with<br>paints and solvents?

2. Flammables

  • a. Is all brush/roller painting using solvent based (flammable)<br>paints done in an open well ventilated area.

  • b. If not, is supply air ventilation designed to sweep across the<br>work area, and is this air then exhausted to the outside?

  • c. Is the ventilation adequate to prevent the buildup of high levels<br>of solvent vapors or to exceed the lower explosive limit of the<br>material which is being used?

  • d. Are flammables and combustibles limited to small amounts<br>needed in the immediate area and are they stored in approved<br>UL/FM flammable liquids storage cabinets?

3. General

  • a. Is Post using water based materials in place of solvent based<br>materials as much as possible?

  • b. Does the paint shop have a current file of Material Safety Data<br>Sheets (MSDS) for all hazardous materials used in the paint<br>shop? Are they available to the employees, have the employees<br>been properly trained, and do they understand the MSDS's.

  • c. Is any sprayer or drying equipment interlocked into the<br>ventilation system to ensure that the ventilation fans are always<br>operating prior to the start of painting or spraying?

  • d. Are hazardous wastes (primarily solvents and paints containing<br>heavy metals) disposed of properly in accordance with U.S. or<br>host country regulations, whichever is more stringent?

C. Ignition Sources

  • 1. Is the electrical system for the paint shop checked regularly to ensure<br>it does not arc, overheat, or produce ignition sources? Are "explosion<br>proof" fixtures checked regularly?

  • 2. If the paint shop does not have interlocking between the ventilation<br>system and the spraying operation, all fixtures within a 3M (10 Ft)<br>radius of the spray booth must be "explosion proof".

  • 3. Does the supervisor enforce "No Smoking" requirements?

  • 4. Are there other ignition sources such as portable heaters, dryers,<br>coffee pots, hot plates, etc. and are they properly controlled?

D. Mass

  • 1. Are flammables cabinets, other storage devices, fans, or other<br>equipment properly secured so that there is little risk of their falling<br>over?

  • 2. If a compressor is used, is it securely attached to the floor or other<br>sturdy support?

E. Rotating Equipment

  • 1. Are fans or any other moving/rotating equipment less than 2.13<br>meters (7 feet) above the floor properly guarded?

  • 2. Are all drive belts and other exposed rotating equipment properly<br>guarded?

F. Noise

  • 1. Is the steady state noise level in the paint shop below the limits in<br>Table 1.1.1 (85 decibels).

G. Static Electricity

  • 1. If the location is subject to lightning, is the building properly<br>protected against lightning strikes or secondary ground surges?

  • 2. If the location is subject to a high buildup of static electricity, is there<br>an SOP for control of static electricity, particularly in the area where<br>the spraying is done?

H. High Pressures

  • 1. Are the compressor, air storage tank, manifolds, and airlines<br>inspected regularly to ensure the integrity of the system?

  • 2. Has the air system been "stepped down" to provide low pressure air<br>for paint sprayers and other air driven equipment used in the shop?

  • 3. If an air compressor is used to supply breathing air does it have a<br>water trap , carbon monoxide and high temperature alarm?

I. Personnel

  • 1. Does the supervisor ensure that all employees know and adhere to<br>safety requirements in the paint shop operation?

  • 2. Are noise sources controlled to the point that noise does not interfere<br>with warning signals in the paint shop?

  • 3. Does the supervisor ensure that only properly qualified employees<br>use the sprayers and other equipment in the shop?

  • 4. Does the supervisor have a qualification and training outline to<br>identify initial and any follow-up training?

  • 4. Does the supervisor have a qualification and training outline to<br>identify initial and any follow-up training?

  • 5. Does the supervisor ensure that PPE is used properly and that<br>employees are not to take "short cuts"?

  • 6. Are the proper warning/caution signs in a language which the work<br>force can understand?

  • 7. Are they posted where the employees can see them?

  • 8. Is the lighting adequate in all the work areas?

J. Fire Protection

  • 1. Is good housekeeping practiced at all times? Is the trash, and<br>especially flammable or combustible trash, taken out every night?

  • 2. Are paint or solvent contaminated rags placed into a covered metal<br>container?

  • 3. Does the supervisor have a current emergency and evacuation plan?<br>Has it been communicated to the employees?

  • 4. Does the paint shop have working fire detection or automatic fire<br>suppression system? Are they regularly maintained?

  • 5. If the paint shop has a booth with a dedicated exhaust system or<br>extensive exhaust ducting for the filtration/ removal of solvents etc, does the ducting or booth have a fire suppression system (fire<br>detector and automatic extinguishing system)?

  • 6. If the fire suppression system, for the spray area or spray booth, is<br>fixed, (sprinklers, or other permanent agent dispensers) are the<br>sprinkler heads covered with either light cellophane bags (.003<br>in/.076MM) or paper bags to protect them from the build-up of<br>spray paint? Are the heads inspected regularly?

  • 7. Does the paint shop have the required number and types of fire<br>extinguishers and are they properly located in accordance with<br>FBO/OPS/FIR's requirements? Have the employees been trained in<br>the proper use of the fire extinguishers?

  • 8. Have there been any changes in operations, or procedures which<br>would require re-positioning of the present fire extinguishers?

  • 9. Are bilingual "NO SMOKING" signs posted and is the policy<br>enforced?

  • 10. Is the spray area separated from the rest of the structure by one hour<br>rated walls?

  • 11. Are the rated walls properly sealed to preclude the passage of spray,<br>gases, smoke, other products of combustion and flame?

  • I certify that all the information listed in the above report are correct and true.

  • Ariel P. Mariano, Assistant Post Occupancy Safety and Health Officer

  • Gus Kosmas, Post Occupancy Safety and Health Officer

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.