Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Site OH&S

  • Has Safe Work Method Statement been left on site and signed by all employees/contractors?

  • We're all leads and tools that were used on site tested and tagged?

  • Has all left over paint and materials been stored neatly in designated area?

  • Has site been left clean/tidy and all rubbish removed?

Products, Colours and Materials.

  • Have all the products and materials been applied according to the finishes schedule?

  • Are all the colours correct and been applied according to the colour schedule?

Ceilings

  • Has the product been checked for coverage & consistency in all areas?

  • Have ceilings been backrolled?

  • Are there any visible cracks, joins, defects or filling required?

  • Is the stipple of the paint finish acceptable?

  • Is there any paint on light fittings or other items?

  • General notes on finish of ceilings.

Walls

  • Has the product been checked for coverage & consistency in all areas?

  • Are there any visible cracks, joins, defects or filling required?

  • Is the stipple of the paint finish acceptable?

  • Is the cutting in to the ceilings straight, neat and with no over painting?

  • General notes on finish of the walls.

Trim & Woodwork

  • Has the product been checked for coverage & consistency in all areas?

  • Are there any visible cracks, mitres, runs, defects or filling required?

  • Is the cutting in to the walls straight, neat and with no over painting?

  • Is the level of finish to all areas free from unacceptable brush marks?

  • Doors been painted top and bottom edges?

  • General notes on finish to trim.

External

  • Has the front step been oiled?

  • Have the lintels been painted and free from defects?

  • Have the eaves been painted and free from defects?

  • Has the spouting been painted and free from defects?

  • Has the fascia been painted and free from any defects?

  • Have the Weatherboards been painted and free from any defects?

  • Has the cladding been painted and free from any defects?

  • Have all external ceilings been painted and free from any defects?

  • Has the steelwork been painted and free from any defects?

  • Has the external doors been painted and free from any defects (including top and bottom edges)?

  • Has the front door been painted and free from any defects (including top and bottom edges)?

  • Have the external windows been painted and free from any defects (including paint on glass/aluminum/window furniture)?

  • Has the meter box been painted and free from any defects?

  • Has the stink pipe been painted and free from any defects?

  • Has the roof been painted and free from any defects?

  • Have the downpipes been painted and free from any defects?

  • Have rendered areas been painted and free from any defects?

  • Has the brickwork been painted and free from any defects?

  • Has the decking been painted/stained/oiled and free from any defects?

  • Have all fences and gates been painted and free from any defects?

General Notes

  • Are all areas free from paint splatter, over painting and all non painted times clean?

  • All items that have been removed; hinges, handles, door/window furniture and other items been reinstalled?

  • Are there any incomplete items or works?

  • General notes?

  • Signed by person completing inspection

  • Signed by Builder/Site Foreman

  • Signed by client

  • Signed by Painter

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.