Title Page
-
Site conducted
-
Job Number
-
Conducted on
-
Location
GENERAL
-
Builders Sign on Site and Visible
-
Bin on Site
-
Site Safety Management Plan check
PAINTING
-
All external cladding and jointing has sealant applied
-
The top and bottom of all doors have been painted
-
Paint walls inside of laundry trough cabinet
-
The threshold has been oiled
-
Deck bearer on balcony face and bottom edge painted
-
Hinges have not been painted
-
If spraying internally, back rolling is required, including cornices
-
Any overspray on finished surfaces
-
All door handles have been refitted & are working (when door furniture is removed, place in sandwich bags to avoid scratches
-
When washing tools, ensure that any splashing does not occur on any building surface
-
If downpipes removed they must be refitted and painted
ACKNOWLEDGMENT
-
I have read and understood the requirements of this inspection as stated in Rivergum Homes Policies and Procedures