GENERAL

  • Builder's sign on site & visible

  • Site safety management plan check

  • Check Selections for Brick, Mortar Colour, Ironing/Pointing Type

  • Window Sill: Brick Length to be approximately 180mm or 3/4 lenght

  • If less than 1km from the coast line, the mortar mix shall be 1 part cement, 3 parts sand

  • 6 sand, 1 cement, 1/2 lime mortar mix (for grey or brighton lite mortar only)

  • Viscourse to protrude 10mm from face of wall

  • Porch areas to have 110mm viscourse on top of first course bricks

  • Brick piers on strip footings to have 2 layers of 110mm viscourse - one at same level as house

  • Brick piers on strip footings to have 2 layers of 110mm viscourse - one on footing

  • 300mm viscourse at slab level

  • 110mm/300mm viscourse around all window and door openings

  • Wall ties must be on both sides of control joints every 3 courses

  • Wall ties to the second to last course of brick wall

  • Face fix ties to be used where there are brace sheets

  • Wall ties to be a maximum 600mm vertically & horizontally

  • Wall ties to openings must be at a maximum of 300mm spacing vertically

  • Wall ties to be on both sides of the control joints and a maximum of 300mm apart vertically

  • If less than 1km from the coast line, stainless steel wall ties & roller joints must be used

  • Ensure that brick courses finish at a minimum of 2 course above bottom of eave and soffit lining

  • Ends of brick sills to be mortared

  • All control joints as per Engineers plans

  • All brickwork is to be thoroughly cleaned. Pressure clean acid wash if required (before eaves install)

  • All control joints require control joint foam to be installed by bricklayer

  • Brickwork to be set back 30mm for stone veneers

  • Ensure brickwork to external doors is well inside quad cover

  • Walls are to be plumb & level. Piers are to be square & line up with other piers

  • Where there are rendered bands or walls there is to be 10mm gap from the window, door sill & reveal

  • All weep holes must be neat and free of mortar

  • If in a Bushfire Zone, all required provisions included

CLEANING

  • All rubbish to be placed in one pile at front of site or in bin

  • If clear access for bobcat is available, 2nd pile can be placed at rear

  • Ensure bottom mortar bed is tidy & consistent

  • All mortar in cavity is to be cleaned out & placed in rubbish pile

  • All mortar on slab to be cleaned off & then swept clean

  • All windows/glass to have mortar washed off while still fresh

  • All neighbouring fencing/property to have mortar washed off while still fresh

  • All empty pallets to be neatly stacked at front of site

  • All leftover (unused & undamaged) bricks to be stacked onto one pallet at front of site

  • No wash up, water slurry etc. is allowed to flow on to the road/drains

  • Toilet is clean & tidy

  • Bin on site

Acknowledgment

  • I have read and understood the requirement of this audit based on Rivergum Homes policies & procedures

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.