GENERAL
-
Builder's sign on site & visible
-
Site safety management plan check
-
Check Selections for Brick, Mortar Colour, Ironing/Pointing Type
-
Window Sill: Brick Length to be approximately 180mm or 3/4 lenght
-
If less than 1km from the coast line, the mortar mix shall be 1 part cement, 3 parts sand
-
6 sand, 1 cement, 1/2 lime mortar mix (for grey or brighton lite mortar only)
-
Viscourse to protrude 10mm from face of wall
-
Porch areas to have 110mm viscourse on top of first course bricks
-
Brick piers on strip footings to have 2 layers of 110mm viscourse - one at same level as house
-
Brick piers on strip footings to have 2 layers of 110mm viscourse - one on footing
-
300mm viscourse at slab level
-
110mm/300mm viscourse around all window and door openings
-
Wall ties must be on both sides of control joints every 3 courses
-
Wall ties to the second to last course of brick wall
-
Face fix ties to be used where there are brace sheets
-
Wall ties to be a maximum 600mm vertically & horizontally
-
Wall ties to openings must be at a maximum of 300mm spacing vertically
-
Wall ties to be on both sides of the control joints and a maximum of 300mm apart vertically
-
If less than 1km from the coast line, stainless steel wall ties & roller joints must be used
-
Ensure that brick courses finish at a minimum of 2 course above bottom of eave and soffit lining
-
Ends of brick sills to be mortared
-
All control joints as per Engineers plans
-
All brickwork is to be thoroughly cleaned. Pressure clean acid wash if required (before eaves install)
-
All control joints require control joint foam to be installed by bricklayer
-
Brickwork to be set back 30mm for stone veneers
-
Ensure brickwork to external doors is well inside quad cover
-
Walls are to be plumb & level. Piers are to be square & line up with other piers
-
Where there are rendered bands or walls there is to be 10mm gap from the window, door sill & reveal
-
All weep holes must be neat and free of mortar
-
If in a Bushfire Zone, all required provisions included
CLEANING
-
All rubbish to be placed in one pile at front of site or in bin
-
If clear access for bobcat is available, 2nd pile can be placed at rear
-
Ensure bottom mortar bed is tidy & consistent
-
All mortar in cavity is to be cleaned out & placed in rubbish pile
-
All mortar on slab to be cleaned off & then swept clean
-
All windows/glass to have mortar washed off while still fresh
-
All neighbouring fencing/property to have mortar washed off while still fresh
-
All empty pallets to be neatly stacked at front of site
-
All leftover (unused & undamaged) bricks to be stacked onto one pallet at front of site
-
No wash up, water slurry etc. is allowed to flow on to the road/drains
-
Toilet is clean & tidy
-
Bin on site