GENERAL
-
Site Safety management plan check
-
Double tanking required to all tiled balconies - 1 below screed and 1 above screed above living areas
-
Waterproofing to balconies to be turned up wall 120mm
-
Top of hobs and top of rendered balcony walls (return down 50mm) prior to rendering
-
Ensure webbing mesh has been used in all corners
-
All excess waterproofing must be cleaned off everything
-
Waterproofing to be turned down 50mm inside puddle flanges
-
Ensure water proofing is applied to underside of door frames on balconies
-
Waterproof shower walls 2000mm high
-
Waterproof bath hob
-
Coving to wall floor junctions including all wet areas & behind vanities
-
Puddle flanges to timber floor by plumber - screwed & glued & ensure they are not drummy
-
All joints & nails in timber floor to be waterproofed
-
Balcony hobs & handrail half height columns to be waterproofed prior to base coat. Top edge & return down 50mm