Title Page
-
Job Number
-
Location
GENERAL
-
Builder's Sign on site & visible
-
Bin on Site
-
Toilet is clean & tidy
-
Safety management plan check
CLADDING
-
Make sure the void scaffold is present & installed safely
-
All flashings installed (windows head etc.) & window stickers removed
-
Viscourse installed around all windows, corners, junctions & protruding 10m to base.
-
Cladding selection as per selections sheet & installed as manufacturer specifications
-
Check bushfire/ocean corrosion requirements
-
Corners & panels line up - string line to be used to ensure all cladding is level
-
All junctions to be finished as per details, clean & tidy & damp coursed appropriately
-
Nails to cladding etc. to be installed straight, in line & consistent
-
Joiners correct & installed
-
Cladding to start 25mm below the slab edge
-
Moldings as per plan
-
Sarking to walls
-
Air vents to base infill & clear of gas bottle location
-
Cladding to finish minimum 100mm above eave height
-
Adhesive joints filled, panels patched, sanded
COLORBOND
-
Cuts to be clean & tidy
-
Flashings as per plan
-
Control joints as per plan
-
Screwed off correctly
-
Channel to eaves installed after lining
-
Foam installed behind windows & corners
-
Check for any scratches and/or damage
- Yes
- No
- N/A
-
Screws must line up, same colour & type
- Yes
- No
- N/A
-
Gable vents installed
-
Screws must have neo's
-
MAXIWALL
-
All exposed reinforcement coated (Hexicon)
-
300mm damp course installed on slab to be trimmed to a 10mm protrusion from wall
-
Control joints installed (mastik on fire walls) - All fire walls to be fully sealed to ensure no gaps & no daylight to be seen
-
Top hat not to be continuous at control joints
-
Top hat runs relevant to wall heights
-
Temporary screw fixing/holes on boundary wall panels to be filled with fire rated silicone
-
Left over panels stacked at front for collection
Acknowledgment
-
I have read and understood the requirements of this audit based on Rivergum Homes policies & procedures