Information

  • Site conducted

  • Job number

  • Conducted on

  • Prepared by

  • Location
  • Inspection completed

GENERAL

  • A/C Ductwork clear of manhole

  • A/C Ductwork junctions to be hung

  • Drain pipework installed to tundish

  • Pipework cut neatly through cladding

  • A/C ducts fitted

  • Fan coil unit installed

  • A/C slab installed (including HWS & RWT)

  • Cut-out & fit grills

  • Wall penetration pipes have been thoroughly sealed & have been flanged

  • Photo of wall penetrations

Acknowledgment

  • I have read and understood the requirements of this inspection as stated in Rivergum Homes Policies & Procedures

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.