Title Page

  • Site conducted

  • Conducted on

  • Location

GENERAL

  • Builder's sign on site and visible

  • Bin on site

  • Site Safety Management Plan check

  • White Card is carried at all times whilst on site

  • Ensure the void scaffold is present & installed safely

1st FIX

  • Exhaust fans checked for recirculating or duct vented to atmosphere on 2 storey homes

  • Power point in meter box

  • Power connected

  • Earth stake connected 50mm off wall & plumb

  • All wiring as per plan

  • All light trimmers drilled & right position checked

  • Isolation switch as per layout A/C layout

  • Prewire for owner septic

  • Prewire for alarm & NBN/Hub

  • Special/s (if required) - intercom, speaker wire, gates, hotwire conduit, public lighting, ducted vac

CUT OUTS

  • GPO's on kitchen back wall to be the same distance from end panels

  • Power point correct distance from basins - minimum 600mm from spout

  • Cut outs thoroughly completed prior to painting or tiling

FINAL

  • All lights & switches working and tested

  • Globes installed

  • Light fittings complete

  • Power point light covers fitted as per selection sheet

  • Ensure only Clipsal products are installed

Acknowledgment

  • I have read and understood the requirements of this inspection as stated in Rivergum Homes Policy & Procedure

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.