Title Page
-
Site conducted
-
Conducted on
-
Location
GENERAL
-
Builder's sign on site and visible
-
Bin on site
-
Site Safety Management Plan check
-
White Card is carried at all times whilst on site
-
Ensure the void scaffold is present & installed safely
1st FIX
-
Exhaust fans checked for recirculating or duct vented to atmosphere on 2 storey homes
-
Power point in meter box
-
Power connected
-
Earth stake connected 50mm off wall & plumb
-
All wiring as per plan
-
All light trimmers drilled & right position checked
-
Isolation switch as per layout A/C layout
-
Prewire for owner septic
-
Prewire for alarm & NBN/Hub
-
Special/s (if required) - intercom, speaker wire, gates, hotwire conduit, public lighting, ducted vac
CUT OUTS
-
GPO's on kitchen back wall to be the same distance from end panels
-
Power point correct distance from basins - minimum 600mm from spout
-
Cut outs thoroughly completed prior to painting or tiling
FINAL
-
All lights & switches working and tested
-
Globes installed
-
Light fittings complete
-
Power point light covers fitted as per selection sheet
-
Ensure only Clipsal products are installed
Acknowledgment
-
I have read and understood the requirements of this inspection as stated in Rivergum Homes Policy & Procedure