Information

  • Site conducted

  • Job Number

  • Conducted on

GENERAL

  • Builders Sign on site & visible?

  • Bin on site?

CABINETRY

  • Bench tops covered with plastic & taped down

  • All doors & drawers working and even gaps

  • All laminated & wall junctions to be caulked

  • Filler pieces to be no more than 30mm thick

  • Check all electrical cables have been pulled through

  • Sufficient clearance for LED strip lighting has been allowed

  • Overhead downlights to have a void fitter for transformer

  • Holes installed in cabinets where required for appliances i.e. washing machine, dishwasher

  • All linen/pantry shelves to be installed correctly with no gaps

  • Install kitchen sink, silicone & seal cut edge

  • All cut-outs to be completed where required before install

  • Leftover materials cut up or loaded

Acknowledgment

  • I have read & understood the requirements of this audit based on Rivergum Homes policies & procedures

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.