Information
-
Site conducted
-
Job Number
-
Conducted on
GENERAL
-
Builders Sign on site & visible?
-
Bin on site?
CABINETRY
-
Bench tops covered with plastic & taped down
-
All doors & drawers working and even gaps
-
All laminated & wall junctions to be caulked
-
Filler pieces to be no more than 30mm thick
-
Check all electrical cables have been pulled through
-
Sufficient clearance for LED strip lighting has been allowed
-
Overhead downlights to have a void fitter for transformer
-
Holes installed in cabinets where required for appliances i.e. washing machine, dishwasher
-
All linen/pantry shelves to be installed correctly with no gaps
-
Install kitchen sink, silicone & seal cut edge
-
All cut-outs to be completed where required before install
-
Leftover materials cut up or loaded
Acknowledgment
-
I have read & understood the requirements of this audit based on Rivergum Homes policies & procedures