Title Page
-
Site conducted
-
Job Number
-
Conducted on
-
Location
GENERAL
-
Builder's Sign on Site and Visible
-
Bin on Site
-
Site Safety Management Plan check
CHECKLIST
-
Roofing 100% complete
-
Downpipes installed and painted
-
Back of parapets lined and sealed
-
Balustrade installed
-
Stickers removed from upper level windows
-
Scaffold free of materials
-
Eaves/canopies installed and painted
-
Aerial installed
-
Solar panels installed (HWS/Photovoltaic)
-
Air Conditioner installed
-
Deckit installed and all pipe penetrations sealed
-
Site to be left clean and tidy
-
Skylights installed
-
Exhaust vents installed
ACKNOWLEDGEMENT
-
I have read and understood the requirements of this inspection as stated in Rivergum Homes Policies and Procedures