Information

  • Project:

  • Project Number:

  • Prepared by:

  • Project Team:

  • Conducted on

Environmental Policy

  • Is the Environmental Policy displayed on site?

  • Is the Policy up to date?

  • Is the Policy signed by CEO?

  • Are Environmental control measures described in method statements?

  • Are Environmental factors included in Risk Assessments? (COSHH)

  • Are Environmental emergency procedures adequately addressed and displayed? (Spill Kit, Bunding)

  • Are Environmental issues adequately addressed at site induction?

  • Are all operatives briefed and aware of good Environmental practices?

  • Are sub-contractors conforming to the companies Environmental Policy?

Site Establishment

  • Are site conditions clean and in good condition?

  • Are there adequate parking facilities off/on site?

  • Are fences, hoardings, and gates in good condition?

Waste Management

  • Is there any existing contamination on site? Is it being dealt with adequately? (Asbestos, Lead, Soil)

  • Does a licensed carrier remove waste? (Copies of waste carriers license on site)

  • Are transfer notes (consignment notes for special waste) in place?

  • Are adequate segregation measures in place?

Energy Management

  • Meter Readings ( Start of project and end of project)

  • Is electrical power for light and heat kept on minimum period?

  • Project lighting ( energy saving lamps)

  • Is water usage minimised?

  • Is plant shut down when not in use?

Water Protection

  • Are consents in place for discharge of water? (Copies of discharge certificates)

  • Are drains identified (surface and sewer)?

  • Is silt being prevented from discharging to watercourses?

  • Are fuel tanks, bowsers and drums within a bund to EA guidelines?

  • Are drip trays in place for plant and machinery ( threading machines, pressurisation units)

  • Are emergency measures in place (spill kits)?

  • Are all chemicals stored safely and marked?

  • Is plant in good condition and without any leaks?

  • Is plant and materials reasonably kept away from drains and watercourses?

Materials Management

  • Are there alternative arrangements for unused materials other than disposal?

  • Are materials such as hardwoods from a sustainable source?

  • Are there arrangements to reuse/recycle existing site material? (SWMP, EAP)

Nuisance

  • Is dust suppression adequate? (H style LEV's, Damping down)

  • Are noise and vibration within reasonable limits? ( refer to RAMS)

  • Are activities smokeless?

  • Are deliveries arranged to minimise disruption to neighbours?

  • Are their arrangements to keep neighbours informed and liaison procedures?

Flora & Fauna

  • Is adequate protection in place for existing planted areas, Tree Preservation Orders?

  • Are measures in place to protect initial life adequate?

Further Comments

  • Enter any other comments

Corrective Actions

  • I confirm that all actions have been completed/the following further action is required*
    Comment as applicable, then sign and date below and return to HS&E Dept.

  • Enter corrective actions

Sign Off

  • Project Manager signature

  • Auditor's signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.