Information
-
Project:
-
Project Number:
-
Prepared by:
-
Project Team:
-
Conducted on
Environmental Policy
-
Is the Environmental Policy displayed on site?
-
Is the Policy up to date?
-
Is the Policy signed by CEO?
-
Are Environmental control measures described in method statements?
-
Are Environmental factors included in Risk Assessments? (COSHH)
-
Are Environmental emergency procedures adequately addressed and displayed? (Spill Kit, Bunding)
-
Are Environmental issues adequately addressed at site induction?
-
Are all operatives briefed and aware of good Environmental practices?
-
Are sub-contractors conforming to the companies Environmental Policy?
Site Establishment
-
Are site conditions clean and in good condition?
-
Are there adequate parking facilities off/on site?
-
Are fences, hoardings, and gates in good condition?
Waste Management
-
Is there any existing contamination on site? Is it being dealt with adequately? (Asbestos, Lead, Soil)
-
Does a licensed carrier remove waste? (Copies of waste carriers license on site)
-
Are transfer notes (consignment notes for special waste) in place?
-
Are adequate segregation measures in place?
Energy Management
-
Meter Readings ( Start of project and end of project)
-
Is electrical power for light and heat kept on minimum period?
-
Project lighting ( energy saving lamps)
-
Is water usage minimised?
-
Is plant shut down when not in use?
Water Protection
-
Are consents in place for discharge of water? (Copies of discharge certificates)
-
Are drains identified (surface and sewer)?
-
Is silt being prevented from discharging to watercourses?
-
Are fuel tanks, bowsers and drums within a bund to EA guidelines?
-
Are drip trays in place for plant and machinery ( threading machines, pressurisation units)
-
Are emergency measures in place (spill kits)?
-
Are all chemicals stored safely and marked?
-
Is plant in good condition and without any leaks?
-
Is plant and materials reasonably kept away from drains and watercourses?
Materials Management
-
Are there alternative arrangements for unused materials other than disposal?
-
Are materials such as hardwoods from a sustainable source?
-
Are there arrangements to reuse/recycle existing site material? (SWMP, EAP)
Nuisance
-
Is dust suppression adequate? (H style LEV's, Damping down)
-
Are noise and vibration within reasonable limits? ( refer to RAMS)
-
Are activities smokeless?
-
Are deliveries arranged to minimise disruption to neighbours?
-
Are their arrangements to keep neighbours informed and liaison procedures?
Flora & Fauna
-
Is adequate protection in place for existing planted areas, Tree Preservation Orders?
-
Are measures in place to protect initial life adequate?
Further Comments
-
Enter any other comments
Corrective Actions
-
I confirm that all actions have been completed/the following further action is required*
Comment as applicable, then sign and date below and return to HS&E Dept. -
Enter corrective actions
Sign Off
-
Project Manager signature
-
Auditor's signature