Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
Project Address. Project Number.
-
Select date
-
Does the project display an environmental policy
-
How have site specific environmental issues been identified
-
How is water, energy consumption reduced/ what measures are in place how are they measured
-
What is done to source and reuse recycled/sustainable materials and products
-
What is done to reduce/remove noise,light, water and air pollution
-
What efforts are made to use local labour, suppliers, trade contractors and material
-
What environmental issues will be covered in the project tool box talks?
-
Has the project assessed the hazardous material impact? Is there a suitable container for Hazmat items? Is there a spill kit on site?
-
What targets are set for improving environmental performance (reduce waste to landfill, reduce water usage and utility usage)
-
Has the design stage process looked at materials and products with a lower level of embodied energy?
-
Peter Barlow Grad IOSH Parkeray Company Health, Safety & Environmental Manager 07966115425 peter.barlow@parkeray.co.uk
-
Name: Title: Project Manager Date.