Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

Project Address. Project Number.

  • Select date

  • Does the project display an environmental policy

  • How have site specific environmental issues been identified

  • How is water, energy consumption reduced/ what measures are in place how are they measured

  • What is done to source and reuse recycled/sustainable materials and products

  • What is done to reduce/remove noise,light, water and air pollution

  • What efforts are made to use local labour, suppliers, trade contractors and material

  • What environmental issues will be covered in the project tool box talks?

  • Has the project assessed the hazardous material impact? Is there a suitable container for Hazmat items? Is there a spill kit on site?

  • What targets are set for improving environmental performance (reduce waste to landfill, reduce water usage and utility usage)

  • Has the design stage process looked at materials and products with a lower level of embodied energy?

  • Peter Barlow Grad IOSH Parkeray Company Health, Safety & Environmental Manager 07966115425 peter.barlow@parkeray.co.uk

  • Name: Title: Project Manager Date.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.