Title Page

    Plot
  • Address
  • Inspection Date

  • Inspector

Oversite

1. Foundations and ground floor

  • a. Ground floor perimeter edge insulation

  • b. External door threshold

  • c. Below damp-proof course on external walls

Roofed

2. External walls

  • a. Ground floor to wall junction

  • b. Structural penetrating elements

3. Roof

  • a. Joist/rafter level

  • b. Eaves and gable edges

4. Openings

  • a. Window positioning in relation to cavity closer or insulation line

  • b. External doorset positioning in relation to cavity closer or insulation line

  • 5. Airtightness

Completion

6. Building services

  • a. Plant/equipment identification label(s), including make/model and serial number

  • b. Primary pipework and continuity of insulation

  • c. Mechanical ventilation ductwork continuity of insulation (for duct sections outside the thermal envelope)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.