Title Page
- Plot
-
Address
-
Inspection Date
-
Inspector
Oversite
1. Foundations and ground floor
-
a. Ground floor perimeter edge insulation
-
b. External door threshold
-
c. Below damp-proof course on external walls
Roofed
2. External walls
-
a. Ground floor to wall junction
-
b. Structural penetrating elements
3. Roof
-
a. Joist/rafter level
-
b. Eaves and gable edges
4. Openings
-
a. Window positioning in relation to cavity closer or insulation line
-
b. External doorset positioning in relation to cavity closer or insulation line
-
5. Airtightness
Completion
6. Building services
-
a. Plant/equipment identification label(s), including make/model and serial number
-
b. Primary pipework and continuity of insulation
-
c. Mechanical ventilation ductwork continuity of insulation (for duct sections outside the thermal envelope)