Title Page

  • Audit Title

  • Conducted on

  • Prepared by

Peer Superintendent and Project Manager

CCC Punch list created Date (should be generated and distributed at 3 weeks prior is Substantial Completion)

  • Select date

Project Dates

  • Contract Completion

Major Concerns of Overall Project Completion Time/Delays

1. Cleanliness

  • Overall Site (material organized, connex's removed, job trailer removed)

  • Overall Building (material organized - Final clean scheduled)

2. Owner Provided Items Missing

  • Steel/HVAC/Lighting/Vendor issues

3. Utilities

  • Permanent Power

  • Gas

  • Water

  • Sewer

4. Onsite/Offsite

  • Offsite signal/roadwork

  • Landscaping/Irrigation

  • Easements Outstanding

5. Exterior of Building

  • Loading Dock Area

  • Parking Lot

  • Striping

  • Site Lighting

  • Exterior Signage

  • Roof Clean & Finished/Skylights/Smoke Vents

  • Exterior Finishes

  • Exterior Joint Sealants

  • Exterior concrete (i.e. sidewalks, ADA ramps)

6. Interior of Building

  • Restrooms

  • Millwork

  • Fire Protection

  • Electrical

  • HVAC

  • Plumbing

  • Offices

  • Breakroom

  • Interior Walls/Sales Floor Walls

  • Floor Finishes

  • Glass/Glazing

  • Auto Entrances

  • Receiving Area

7. Support Team

  • Alarm

  • Cabling

  • Telecom

  • Cameras

8. Occupancy/Licensing

  • TCO or C of O status

  • Stocking Permit

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.