Title Page
-
PER Safety & Quality Compliance Checklist
-
Document No.
-
Conducted on
-
Prepared by
Safety Compliance
-
Suspended Loads
SL@
-
Scan QR code to identify location
-
Select team
- Weaving A
- Weaving B
- Weaving C
- Weaving D
- Seaming A
- Seaming B
- Seaming C
- Finishing A
- Finishing B
- Finishing C
- Shipping
When an employee is moving or guiding a suspended load:
-
Did the employee make sure the path was clear of pedestrians and obstacles?
-
If Non-Compliant take a picture (if applicable) AND document a follow up item.
-
Were employees directly under the load, or in the “line of fire”?
-
If Non-Compliant take a picture (if applicable) AND document a follow up item.
-
Were the materials being hoisted rigged to ensure they are secured?
-
If Non-Compliant take a picture (if applicable) AND document a follow up item.
-
Were the materials rigged by a qualified rigger?
-
If Non-Compliant take a picture (if applicable) AND document a follow up item.
-
Were slings checked for wear before each lift? Add evidence.
-
If Non-Compliant take a picture (if applicable) AND document a follow up item.
-
Were load weights checked to ensure lift device has capacity?
-
If Non-Compliant take a picture (if applicable) AND document a follow up item.
-
Were crane checks done EVERY shift before crane use?
-
If Non-Compliant take a picture (if applicable) AND document a follow up item.
-
Did an outside contractor check the cranes on the bi-annual basis?
-
If Non-Compliant take a picture (if applicable) AND document a follow up item.
-
Was an unsafe behavior or condition noticed while moving or guiding a suspended load?
-
If Non-Compliant take a picture (if applicable) AND document a follow up item.
-
Was an unsafe crane operated by the employee?
-
If Non-Compliant take a picture (if applicable) AND document a follow up item.
-
Were the weight of all items known and verified to be within the capacity of the lift system?
-
If Non-Compliant take a picture (if applicable) AND document a follow up item.
Quality Compliance
-
Shute loops compliance
Shute loops compliance @ loom
-
Scan QR code to identify location
-
Select team
- Weaving A
- Weaving B
- Weaving C
- Weaving D
- Seaming A
- Seaming B
- Seaming C
- Finishing A
- Finishing B
- Finishing C
- Shipping
-
For each shute yarn position, air hose gently (approx. ¼ of full pressure) 14 eyelets/contact points from CAT tensioner to barrel. 2X per hour as loom stops.
-
If Non-Compliant take a picture (if applicable) AND document a follow up item.
-
For each shute yarn position, brush out using pipe cleaner 14 eyelets on OFS including CAT tensioner. 2X per shift.
-
If Non-Compliant take a picture (if applicable) AND document a follow up item.
-
Using the go/no-go gauge, verify that pullback of one 0.50 mm position is within the green area.
-
If Non-Compliant take a picture (if applicable) AND document a follow up item.
-
Verify that the pullback test has been done after spool change, look for side mark from beat up point to take up roll.
-
If Non-Compliant take a picture (if applicable) AND document a follow up item.
-
Verify that the pullback test has been done for other reason other than after spool change, look for side mark from beat up point to take up roll.
-
If Non-Compliant take a picture (if applicable) AND document a follow up item.
-
When last element is audited, please sign audit AND tap on the "Mark as complete" button.