Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
General
-
Permit valid. From Date: Time: To Date: Time:
-
Site Induction complete
-
Green card sighted
-
SWMS have been received
-
Company
-
Brief description of works
Work Permits - are any of the following work permits required?
-
Hot Works
-
Energy isolations
-
Confined space
-
Working at heights
Working Area
-
Location
-
Number of workers
Personal Protective Equipment
-
Is there any requirement for PPE
-
Does the worker have all required PPE to complete the works
Hot Works Requirements - to be completed by Key Services
-
CO2 fire extinguisher provided
-
Barricades, warning, signs & spark/flash screens provided
-
Work area, trenches, pits clear of flammable liquids, gases or vapours
-
Combustibles located within 15m removed or protected with non combustible curtains, metal guards or flame proof covers
-
All floor and wall openings within 15m have been covered to prevent the transmission of sparks
-
The work area and all adjacent areas have been inspected at the completion of works ensuring no fire conditions were present
-
The hot work area and any adjoining areas must be patrolled from the start of the work until 60 minutes after the work is completed
-
The work area has been cleaned and clear to prevent any trip or slip hazards
Hot Works Requirements - to be completed by Building Managment / Security
-
Fire Sprinklers and / or thermal detectors must be confirmed operational where installed
-
Smoke detectors must be isolated in the work area
-
The work area and all adjacent areas where sparks may spread were inspected after works complete, ensuring no fire conditions were present
-
De-isolation of the smoke detectors within hot works area within 40 mins of the completion of the works
-
Building Managment / Security
Energy Isolations
-
Has approval been given for the isolation
-
Testing equipment is in good working order
-
Locks and/or tags have been installed
Confined Space
-
Has the worker completed confined space training
-
Confined space permit completed.
Working at Heights
-
Has the worker completed working at heights training
-
Has the worker been trained in the use of fall restraint equipment
-
Fall restraint system required
-
Fall restraint equipment is in good working order and in date
Completion of Work
-
Has the work area been restored to normal safety / housekeeping requirements
-
Have all Isolations and alarms been reactivated
-
Signed Key Services
-
Signed Subcontractor