Title Page
-
Contract Number and Name:
-
Conducted on:
-
Report Prepared by:
-
Location
-
Site Manager / Company Representative
Inspection
-
Site set-up: i.e. signs, posters, hoardings, site office, fencing and security.
-
RAMS signed
-
Work at height: i.e. scaffold, edge protection, access equipment (podiums, ladders etc.)
-
Segregation: i.e. vehicle routes, pedestrian access and egress
-
PUWER: i.e plant and equipment, tools etc. fit for purpose and used correctly.
-
LOLER: i.e. lifting operations: cranes, telehandlers, gin wheels, Genie lifts etc.
-
Excavations: i.e. shoring, propping, access and egress, edge protection, confined space
-
PPE/RPE: i.e. compliant with site rules, in good order i.e. clean, not torn, correct boots.
-
Welfare: i.e. clean, no soap bars, provisions in place, adequate for numbers, drinking water, provision to heat food.
-
Waste storage area: i.e. tidy, covered skips, segregated
-
Hazardous materials: i.e. correct storage of fuels and chemicals (COSHH Store)
-
Wash areas: i.e. concrete washout and vehicle washing
-
Housekeeping: i.e site and office tidiness
-
Fire precautions: i.e. fire extinguishers, Emergency Contacts list displayed, muster point clearly identified.
-
COVID-19 compliance i.e. 2 mtr social distancing and briefings.
-
Director / Manager Name:
-
Site Manager / Supervisor: