Information
-
Audit Title
-
Client / Customer
-
Conducted on
-
Prepared by
-
Location
-
Weather
-
Wind
Erosion Controls
Silt Fencing
-
Stakes are securely in the dirt and are not broken.
-
Rips or tears in the fence fabric.
-
Significant bulging in the fence fabric.
Straw/Hay Bales
-
Bales are bound with twine and are intact.
Soil Stock Piles
-
Soil stock piles are properly protected from runoff into environmentally protected areas.
Heavy Equipment
-
Spill kits are on site and available when heavy equipment is present on site
-
Refueling prohibited in wetland buffer areas
-
Spill kit is readily accessible at the refueling location
Endangered Flora/Fauna
-
Have the owners/General Contractor identified that there are endangered or rare species of plants or animals present that need additional controls/precautions?
Site Dewatering
-
Is dewatering of the site being accomplished in accordance with the project Storm Water Pollution Prevention Plan?
-
Is there any evidence of silt runoff into the adjacent areas or waterways?
Concrete Washout
-
Project is provided with an area to wash out concrete trucks
Contaminated Soil
-
Health and Safety Plan (HASP) on site and signed
-
Proper PPE is being worn
-
Medical Surveillance, if applicable
-
Industrial Hygiene Sampling performed, if applicable
-
HAZWOPER trained, if applicable
-
Media
-
Comments
-
Signature of person performing the audit