Information
-
Workorder No.
-
Audit Title
-
Conducted on
-
Prepared by
-
Location
-
Work to be done description
Repair details
-
Urgency of repair
-
Work to be completed description
-
Suggested repair Date/time
Assessment details
-
Locations complete
-
Shutoff required?
-
School in shutoff block?
-
Business in shutoff block?
-
Hospital in shutoff block?
-
Residential in shutoff block?
-
Number of valves in shutoff?
-
Additional resources required for shutoff?
-
Notification cards required?
-
Number of cards required?
-
Traffic control required?
-
Traffic control special details
-
Fittings required for repair?
-
Can be completed by 2 man team?
-
Can this be completed with 5.5t excavator?
-
Can site be accessed be excavator trailer?
-
Welder required to perform on-site work?
-
Special requirements or instructions? Eg: shoring, hydro escalation, cold/hot mix
-
Add photo