Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Safety of areas where equipment installed
-
Is the area free of a obvious drainage problems ?
-
All equipment securely fixed unless it is designed to be portable ?
-
Is area free from any tripping hazards (tree roots, remains of equipment, fallen tree branches, uneven under surfacing ) ?
-
Are all borders secure and free of splinters ?
-
Is fall zone free of rocks, stones, glass or other sharp objects ?
-
Was area free of other problems ?
Materials construction and installation of equipment
-
Is the equipment complete no missing parts ?
-
Are all timber joints and joints between timber and steel fastened properly ( all main bearing joints bolted ) ?
-
Are timber components free of excessive warping or splintering ?
-
Is all steel used for construction stainless or coated ( galvanised, powder coated, or painted ) ?
-
Are all end sections of tubular steel capped ?
-
Are all accessible bolt heads and nuts recessed, rounded or covered with protective caps and galvanised, coated or made from stainless steel ?
-
Are all small components including fasteners present ?
-
Are all components free from distortion ( eg. Not bent, vandalised or out of level ) ?
-
Is protective paint ( timber and steel ) or coating in good condition ?
-
Is all steel chain and it's connectors galvanised or made from corrosion resistant metal ?
-
Is equipment free from excessive rust, or evidence of broken members or cracked welds ?
-
Are all plastic, fibreglass components free of cracks, damage or wear that would effect their durability or safe use ?
-
Are concrete elements stable ?
-
Are all fixed structures ( including footings ) stable and do not deflect by the loading or movement of the user ?
-
Ae all footings and foundations covered with compacted soil so they do not protrude above ground ?
-
Are guard rails and hand rails secure ?
-
Ae shackles and wire ropes operating smoothly and lubricated if necessary ?
-
We rope nets sound including attachment and anchor points ?
-
Was area free from other problems during the audit ?
Opportunities for improvement
-
Comments
-
Signed
-
Add signature
-
Add signature