Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
SITE PRESENTATION
-
1. Site looks presentable on approach?
-
2. There is BPJV directional signage to the site?
-
3. The Project Signboard is in place?
-
4. BPJV sign in place with builders registration no displayed?
-
5. There are BPJV PPE Signs at each site entry point?
SITE PERIMETER
-
1. Fence clips are fitted at all panel to panel joints?
-
2. All site access gates have secure locks and chains?
-
3. Fence looks visually tidy and in good condition?
SITE COMPOUND
-
1. The site parking area is well established?
-
2. The site toilets are clean and well stocked?
-
3. Crib 1 is clean and well stocked?
-
4. Crib 2 is clean and well stocked?
-
5. The Safety Office is clean and tidy?
-
6. The site first aid point is clearly identified?
-
7. First aid kit stocked?
-
8. There is an eyewash station available on site?
-
9. Site Office 1 is clean and tidy?
-
10. Site Office 2 is clean and tidy?
SAFETY NOTICES AND POSTERS
-
1. Up to date BPJV Policies are displayed in crib 1?
-
2. Up to date BPJV Policies displayed in crib 2?
-
3. Up to date Site Contacts displayed in crib 1?
-
4. Up to date Site Contacts displayed in crib 2?
-
5. Up to date Emergency Plan displayed in crib 1?
-
6. Up to date Emergency Plan is displayed in crib 2?
SAFETY PROVISIONS
-
1. There are visitor safety helmets and hi viz available in the safety office?
-
2. There is spare safety glasses in the safety office?
-
3. There is spare gloves and glove clips in the safety office?
-
4. There are ear plugs available in the safety office?
-
5. There is ample supply of sun protection cream available?
-
6. There is a supply of bunting available for use by BPJV on site?
-
7. There is a means of producing required safety signage as required for use by BPJV on site?
-
8. There are adequate star pickets available for use by BPJV?
TEMPORARY POWER
-
1. The first main incoming power board is secure?
-
2. The first incoming power board is tagged in date?
-
3. The compound temporary power board is secure?
-
4. The site compound power board is tagged in date?
-
5. The site compound power board has external isolators for emergency use?
-
6. The temporary power cabling has "Temporary Power" labelling fitted?
-
7. The main on site temporary power board is tagged in date?
-
8. The temporary power cabling is installed safety off the ground as applicable?
-
9. The temporary site power distribution boards are tagged in date?
-
10. The power leads into the temporary power boards are safely entering the board?
PLANT PRE-START LOG BOOKS
-
1. Is the log book filled in today for Generator 1?
-
2. Is the log book filled in today for Generator 2?
-
3. Is the log book filled in today for Generator 3?
-
4. Is the log book filled in today for Generator 4?
-
5. Is the log book filled in today for Boom lift 1?
-
6. Is the log book filled in today for Boom lift 2?
-
7. Is the log book filled in today for Scissor Lift 1?
-
8. Is the log book filled in today for Scissor Lift 2?
-
9. Is the log book filled in today for Scissor Lift 3?
-
10. Is the log book filled in today for Scissor Lift 4?
-
11. Is the log book filled in today for Scissor Lift 5?
-
12. Is the log book filled in today for Scissor Lift 6?
-
13. Is the log book filled in today for Scissor Lift 7?
-
14. Is the log book filled in today for Scissor Lift 8?
MOBILE PLANT
-
1. All mobile plant in use on site has operating flashing beacons on?
-
2. Plant operators have competency tickets?
-
3. Mobile plant visually inspected appears in good order?
-
4. Mobile Plant where not in use is secured from unauthorised access?
-
5. Mobile plant pre-start assessments are being obtained before plant is approved for use on site?
MOBILE SCAFFOLDING
-
1. Scaffold is erected at suitable height for the activities being carried out?
-
2. Cross bracing is installed?
-
3. Diagonal bracing is installed?
-
4. A suitable platform access ladder is installed?
-
5. Toe boards are installed?
-
6. Hand rails and knee rails are installed?
-
7. Adjustable wheels are installed, adjusted levelling scaffold and locked if in use?
-
8. If the platform is over 5m then the scaffold has been erected and is tagged by competent scaffolder?
CRANE DOCUMENTATION SETUP & OPERATIONS
-
1. Crane operation underway on site today?
-
2. Has the crane documentation been reviewed and approved by The Safety Officer and Site Manager?
-
3. Has the crane operation JHA been reviewed and approved for the activities being undertaken?
-
4. Has an acceptable safe work zone been established excluding other workers?
-
5. Is there adequate crane operation safety signage in place?
-
6. Does the rigger/s as applicable have suitable competency ticket/s?
-
7. Are the crane lifting operations being observed being done safely?
ACCESS SCAFFOLDING
-
1. Is the Admin scaffold tag in date?
-
2. Is the CB1 scaffold tag in date?
-
3. Is the CB2 scaffold tag in date?
-
4. Is the CB3 scaffold tag in date?
-
5. Is the CB4 scaffold tag in date?
-
6. Is the CB5 (Alkimos only) scaffold tag in date?
-
7. Is the Library scaffold tag in date?
-
8. Is the CAB scaffold tag in date?
-
9. Is there a means of securing access scaffolds out of hours?
PERMITS SYSTEMS
-
1. Is the Hot Work permit system being used on site?
-
2. Is the working at Height Permit system being used on site?
-
3. Is the Excavation permit system being used on site?
-
4. Is the confined Space permit system being used on site?
-
5. Are copies of permits being given to operatives on site?
-
6. Are permits being filled in correctly?
-
7. Are works under the permits being done in accordance with the permit? If any observed!
-
8. Are the permits being closed out properly?
Sign Off
-
11.2 - Project Managers signature