Information
-
Project Manager Safety Inspection
-
Job Name and Number
-
Conducted on
-
Prepared By:
- Pat Olson
- Danny Grimes
- Josh Snowden
- James Stevens
- Bill Smiley
- Matt Tolbert
- Greg Gilreath
- Rusty Carver
- Brian Springer
- Brad Hawkins
-
Location
-
Superintendent
Soft Tissue Injury Mitigation Program
-
Material Handling Plan in Place no Lifting over 55 Lbs
-
Material Moving Equipment on site and in use (i.e. carts, dolleys, hoists, fork lifts, etc.)
-
Proper Lifting procedures, addressed on site specific plan and enacted on the field?
-
Repetitive motion injuries addressed and plan in place to mitigate them?
-
Team members trained on STOMP procedures.
-
Comments
Fall Protection and Ladders
-
Fall protection in use, in good condition, inspected, and within expiration date
-
Ropes and rope grabs inspected and anchored correctly
-
Anchors are in sound condition and secured to a proper point. Capable of supporting at least 5000 pounds per worker
-
Retractable lanyards are used in boom lifts/scissor lifts
-
Floor holes (over 2 inches) and wall openings properly protected, securely covered and marked
-
Ladders in good condition; tied back; extended 3ft. beyond the landing point. Ladder angle at 4:1 ratio
-
Step ladders inspected and spreader bars extended and locked in place while in use
-
Extension ladders should be used only for access no work performed from ladders ?
Electrical Safety Procedures
-
Is Energized work being performed?
-
Is the qualified person trained in hot work procedures
-
Is the proper PPE available and inspected
-
is there a back up person trained in the procedures available
-
LOTO Procedures in place?
-
Affected team members trained?
-
LOTO equipment on site and being used?
-
Electrical equipment connected properly, grounded and in good condition. GFCI in good condition.
-
Comments
Tools and Equipment
-
Tools and equipment in good condition and properly guarded
-
All mobile equipment inspected and documented daily by competent person and operator has been trained in operation.
-
Seatbelts in use by all operators and passengers
-
Back-up alarms are functional
General
-
Safe access to work area and good housekeeping
-
Barricades/warning signs in place
-
Fire extinguisher: good condition, current inspection<br>tag, 50 ft. rule
-
First aid; kit and certified employees onsite. Eye<br>wash available
-
Paperwork and other Postings
-
Employees have received Safety Orientation and are familiar with JBI Safety Procedures
-
-
OSHA posters and emergency phone numbers posted
-
Job logs, Job Safety Check Sheets being performed and JHA completed
-
Daily Huddle conducted at the beginning of each shift and documented
-
Site specific safety plan being used and updated as job progresses.
-
Employees have received a site specific safety orientation and signed the site specific safety plan.
-
Task training performed and employee suitability<br>verified prior to task assignment
-
Address behavioral issues positive and negative – Other general comments – PPE worn – Supervisor set proper example – accidents / near misses reported
-
Project Manager Signature