Information

  • Project Manager Safety Inspection

  • Job Name and Number

  • Conducted on

  • Prepared By:

  • Location
  • Superintendent

Soft Tissue Injury Mitigation Program

  • Material Handling Plan in Place no Lifting over 55 Lbs

  • Material Moving Equipment on site and in use (i.e. carts, dolleys, hoists, fork lifts, etc.)

  • Proper Lifting procedures, addressed on site specific plan and enacted on the field?

  • Repetitive motion injuries addressed and plan in place to mitigate them?

  • Team members trained on STOMP procedures.

  • Comments

Fall Protection and Ladders

  • Fall protection in use, in good condition, inspected, and within expiration date

  • Ropes and rope grabs inspected and anchored correctly

  • Anchors are in sound condition and secured to a proper point. Capable of supporting at least 5000 pounds per worker

  • Retractable lanyards are used in boom lifts/scissor lifts

  • Floor holes (over 2 inches) and wall openings properly protected, securely covered and marked

  • Ladders in good condition; tied back; extended 3ft. beyond the landing point. Ladder angle at 4:1 ratio

  • Step ladders inspected and spreader bars extended and locked in place while in use

  • Extension ladders should be used only for access no work performed from ladders ?

Electrical Safety Procedures

  • Is Energized work being performed?

  • Is the qualified person trained in hot work procedures

  • Is the proper PPE available and inspected

  • is there a back up person trained in the procedures available

  • LOTO Procedures in place?

  • Affected team members trained?

  • LOTO equipment on site and being used?

  • Electrical equipment connected properly, grounded and in good condition. GFCI in good condition.

  • Comments

Tools and Equipment

  • Tools and equipment in good condition and properly guarded

  • All mobile equipment inspected and documented daily by competent person and operator has been trained in operation.

  • Seatbelts in use by all operators and passengers

  • Back-up alarms are functional

General

  • Safe access to work area and good housekeeping

  • Barricades/warning signs in place

  • Fire extinguisher: good condition, current inspection<br>tag, 50 ft. rule

  • First aid; kit and certified employees onsite. Eye<br>wash available

Paperwork and other Postings

  • Employees have received Safety Orientation and are familiar with JBI Safety Procedures

  • OSHA posters and emergency phone numbers posted

  • Job logs, Job Safety Check Sheets being performed and JHA completed

  • Daily Huddle conducted at the beginning of each shift and documented

  • Site specific safety plan being used and updated as job progresses.

  • Employees have received a site specific safety orientation and signed the site specific safety plan.

  • Task training performed and employee suitability<br>verified prior to task assignment

  • Address behavioral issues positive and negative – Other general comments – PPE worn – Supervisor set proper example – accidents / near misses reported

  • Project Manager Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.