Title Page
-
Site conducted
-
Conducted on
-
Reviewed/Completed by
Summary
-
Project Status / Work in Progress
-
Positive Observations / Improvement Opportunities Identified
Briefing and Toolbox Talks - Worker Engagement
-
Are regular briefings being conducted between the main work crew and other contractors/subcontractors
-
Toolbox Talk / Safety Meeting discussion held with workers (Please record discussion notes below along with a photo of attendees)
Untitled Page
Site Control
-
Site signage is installed where required
-
Notifiable works notification to Worksafe has been completed
-
Main contractor H&S documentation is in place
-
Risk is being reviewed regularly by main contractor
-
Subcontractor SSSP detail has been received and approved
-
Safety inductions are conducted for all working site personnel
-
Critical/High Risk work has been risk assessed with TA/SWMS in place
Facilities
-
Adequate facilities are in place/provided for workers
-
Clean running water is available
-
First Aid Kit(s) is in place and well stocked
-
Fire Extinguishers are sufficient in number, compliant with current tagging and in place for emergency use
-
A spill kit is in place where relevant
House Keeping
-
There is adequate lighting
-
There is adequate ventilation
-
Materials are safely stacked / secure
-
Access and egress routes are clear of obstacles
-
There is suitable protection in place to protect general pubic where necessary
-
Adequate rubbish removal methods are in place
-
Slip and trip hazards are controlled
-
Fall hazards are controlled
Accident and Near Miss Reporting
-
Has there been any recent incidents
-
Have recent incidents been discussed and investigated where necessary
-
Has corrective/preventative action been agreed
Personal Protective Equipment (PPE)
-
Hardhats are being worn for tasks with overhead/height risk
-
Correct, closed in footwear is being worn
-
Other relevant PPE is being used for taking - Eye, Ear Protection and Respiratory Protection
-
Are there any concerns around hazardous tasks that require additional monitoring ie noise, fumes
Electrical Equipment & Tools
-
Was the main connection installed by suitably qualified electrician with evidence of eWOF/COC
-
Leads are elevated off the ground and clear of water
-
Appropriate guard blades are in place on tools/equipment
-
Cutting stations are set-up safely
Standing Scaffolding
-
Scaffolding has been installed by a certified scaffolder
-
Acu-log tags are clearly attached and showing as safe with inspection within 7 days
-
Guard railing and mid railing is in place
-
Toe boards are in place
-
Platforms are secure
-
Safe access/egress is in place via ladders or stairs
-
Debris netting or scaffolding wrap is in place and in good condition
Welding / Hot Works
-
Fire Extinguishers are on hand
-
Operators are using correct additional PPE
-
Welding screens / protection is in place where relevant
-
Flash back protection is fitted to any gas cylinders
-
Gas bottles are secured appropriately whilst in use and when stored
Hazardous Substances
-
There is a register in place to identify any Hazardous Substances being stored or used on site
-
SDS Sheets for each product are available and within 5yrs
-
Operators are familiar with and following correct handling, use, storage and disposal requirements